3.13 FIELD QUALITY CONTROL<br />

3.13.1<br />

3.13.2<br />

3.13.3<br />

3.13.4<br />

3.14 PROTECTION<br />

3.14.1<br />

3.14.2<br />

3.14.3<br />

Chemical Analysis: Perform chemical analysis in accordance with the approved<br />

Sampling and Analysis Plan (SAP).<br />

Confkrnation Sampling: Collect confirmation soil samples from the ‘excavation<br />

bottom and sidewalls in accordance with the SAP.<br />

Soil Tests: For each loose lift, take representative samples from both the foundation<br />

layer and the vegetative layer for testing at the frequencies listed in Table 02200-1,<br />

EARTH<strong>WORK</strong> TESTING REQUIREMENTS.<br />

Moisture Content and Density Tests: Perform moisture content and density tests in<br />

a grid pattern on the upper foundation layer and the vegetative layer. Stagger the grid<br />

pattern for successive lifts so that sampling points are not at the same location in each<br />

lift. Moisture content and density tests will be performed in accordance with<br />

Table 02200- 1, EARTH<strong>WORK</strong> TESTING REQUIREMENTS. Observe and<br />

visually classify in accordance with ASTM D2488 with notes recorded on the daily<br />

inspection reports.<br />

Weather Conditions: Do not place or compact general fill, foundation layer material,<br />

or vegetative cover during adverse weather conditions.<br />

Excess Surface Water: Remove excess surface water before placement of additional<br />

general fill, foundation layer, or vegetative cover. Kin-place material is reworked and<br />

recompacted, compact affected areas in the same manner as the rest of the area.<br />

Repair and reestablished grades darnaged by erosion before acceptance of the work.<br />

Subgrade Fill: During construction keep subgrade fill and excavations shaped and<br />

drained. Maintain ditches and drains along subgrade in a manner that permits<br />

drainage of water. Do not disturb the finished subgrade by traffic or other operations<br />

and protect and maintain in a satisfactory condition until base course or pavement is<br />

placed. The storage or stockpiling of materials on the finished subgrade will not be<br />

permitted. No base course, or pavement will be laid until the subgrade has been<br />

checked and approved. Do not place base course<br />

subgrade.<br />

or pavement on a muddy or spongy<br />

END OF SECTION<br />