PART 3 EXECUTION<br />

3.1 INSTALLATION<br />

3.1.1<br />

3.1.2<br />

3.1.3<br />

3.1.4<br />

3.1.5<br />

3.1.6<br />

3.1.7<br />

Use deployment methods and equipment that do not damage the geomembrane or the<br />

supporting subgrade surface.<br />

Use deployment and installation methods that minimize wrinkles. Remove<br />

geomembrane folds and fishmouths.<br />

Use trained personnel to perform seaming operations using seaming equipment<br />

specifically designed for that purpose.<br />

Use double-wedge fusion welding as the primary welding procedure. Use extrusion<br />

welding for repairs and detail work.<br />

Perform fusion and extrusion welding in accordance with the Installer’s approved<br />

CQC manual.<br />

Installer is responsible for determining whether seaming should be restricted or halted<br />

due to weather conditions. QA personnel will increase the frequency of testing in<br />

adverse weather conditions. Failing test welds will be cause for rejection of panels<br />

installed in adverse weather conditions.<br />

Use the same type of resin for the extrusion rod as for the geomembrane.<br />

3.2 FIELD QUALITY CONTROL<br />

3.2.1<br />

3.2.2<br />

3.2.3<br />

3.2.4<br />

3.2.5<br />

Test in accordance with Table 02271-1.<br />

Installer is responsible for performing trial welds. QA personnel are responsible for<br />

documentation during peel testing.<br />

Produce and test trial welds at least once every five hours. Perform additional tests<br />

in case of inclement weather, or at the direction of QA personnel. Installer is<br />

responsible for performing non-destructive tests. The QA personnel will observe and<br />

log results of these tests.<br />

Non-destructively air pressure test fusion welds over the entire length of the seam.<br />

See Installer’s approved CQC manual for procedure.<br />

Non-destructively test extrusion welds over the entire length of the seam using the<br />

vacuum box method of testing. See Installer’s approved CQC manual for procedure.<br />

SJ/5-14-96/SACTERUlTORDOU2/02271 02271-7 Geomembrane