and longer fuel cycle length for UMo core (8.5 gU tot /cc) in comparison to the reference load<br />

with standard BR2 fuel with mixed absorbers.<br />

A preliminary choice was made to lump the new burnable absorber in 36 Cd wires<br />

in the Al stiffeners of the fuel element. The optimum diameter for the different fuel types is as<br />

follows: D=0.55 mm for HEU (1.3 gU tot /cc); D=0.4 to 0.5 mm for fuel type UMo (8.5 gU tot /cc);<br />

D=0.4 mm for UMo (7.5 gU tot /cc).<br />

The preliminary calculations of the axial distributions of the neutron fluxes for the<br />

UMo core have shown a significant impact on the performance goals: reduction of the<br />

thermal fluxes in the axis of the fuel channels (30 to 35%) and about 10% in the experimental<br />

positions in reflector channels, which needs future optimization studies.<br />

3. Sheathed Cd wires design and manufacturing<br />

3.1 Sheathed Cd wires design<br />

Following the conclusions of SCK●CEN concerning the replacement of the current poisons,<br />

mixed in the fuel core, by cadmium wires in the stiffeners, two options were investigated by<br />

AREVA-CERCA: sheathed or not sheathed cadmium wires. BR2 early decided to eliminate<br />

the use of not sheathed cadmium wire: (i) cadmium is soluble in acid environment, (ii) reactor<br />

water pool pH is slightly acid, (iii) cadmium solubility increases with temperature.<br />

AREVA-CERCA studied different methods to sheath the cadmium wires: by coating or by<br />

cadmium wire insertion into an aluminium sheath. As regard to the specification, the second<br />

technical principle was selected as the most appropriated. This solution is already used since<br />

years by some other customers. AREVA-CERCA masters this manufacturing and has a long<br />

experience feedback.<br />

3.2 Sheathed Cd wires manufacturing<br />

The cadmium wires are inserted into an aluminium alloy sheath. End plugs made of the<br />

same aluminium alloy close the both extremities in Fig 2.<br />

Figure 2: Sheathed cadmium wire<br />

Various inspections are performed:<br />

- Leak-tightness test<br />

- Dimensional inspection.<br />

- Dimensions as well as the positioning of the cadmium inside the sheath.<br />

- Cadmium integrity<br />

- Visual inspection.<br />

4. BR2 fuel element design and mechanical studies<br />

A design study was performed to insert the cadmium wires in the stiffeners. In order to avoid<br />

any major change on the fuel assembly or plate design, the following criteria have been<br />

*AREVA-CERCA, a subsidiary of AREVA NP, an AREVA an SIEMENS company<br />