18.02.2014 Views

RRFM 2009 Transactions - European Nuclear Society

RRFM 2009 Transactions - European Nuclear Society

RRFM 2009 Transactions - European Nuclear Society

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 2: The Si doping facility is approaching the irradiation channel<br />

In order to allow the decay of the induced 31 Si activity the irradiated Si ingots are left for 2<br />

days in the decay area of the FRM II’s storage pool. Subsequently they are taken out using<br />

again the vacuum equipment for moving them from the irradiation basket into the loading<br />

basket. Upon taking them out of the reactor pool the ingots are rinsed with fresh deionized<br />

water and finally cleaned in an ultrasonic bath.<br />

Before shipment back to the customer the Si is released according to the German<br />

radioprotection regulations. The limiting values to be met are a surface contamination of<br />

< 0.5 Bq/cm² and a specific activity of < 0.09 Bq/g. It is noteworthy that in general the<br />

mentioned limits are kept without problems, a fact which impressively demonstrates the<br />

purity of the starting material.<br />

Already in 2007, the first year of operation of the semiautomatic Si doping facility, a total 3.8 t<br />

of Si was processed in 180 separate irradiations. Since the industrial demand turned out to<br />

be continuously high these numbers were increased in 2008 to 9.8 t and 526 single<br />

irradiations. In order to satisfy this demand a two shift system for Si doping was implemented<br />

at FRM II in June 2008.<br />

285 of 455

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!