18.02.2014 Views

RRFM 2009 Transactions - European Nuclear Society

RRFM 2009 Transactions - European Nuclear Society

RRFM 2009 Transactions - European Nuclear Society

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2009</strong> CNEA REPORT ON PROGRESS ON THE DEVELOPMENT<br />

OF LEU FUELS and TARGETS in ARGENTINA<br />

S. BALART, P. CRISTINI, C. FERNÁNDEZ, A. G. GONZALEZ, M. LÓPEZ, H. TABOADA<br />

Comisión Nacional de Energía Atómica<br />

Av. Del Libertador 8250 (1429) Ciudad de Buenos Aires, , República Argentina<br />

ABSTRACT<br />

Since <strong>RRFM</strong> 2008 meeting, held in Hamburg, Germany, LEU fuel and target R&D<br />

activities in CNEA were focused on: the commissioning for operation of the LEU<br />

core converted RA-6 reactor, applied research and development on dispersed U-<br />

Mo/Al(-Si) in Al cladding and monolithic U-Mo in Zry-4 cladding concepts to<br />

understand reaction mechanisms in interaction zone formation and developing<br />

promissory solutions for VHD monolithic and dispersed fuels and also CNEA<br />

continued deploying R&D on LEU target and radiochemical technology for<br />

radioisotope production, meeting international quality standards<br />

1. Commissioning for operation for the RA-6 reactor with its new LEU core.<br />

The RA-6 reactor is a pool-type 0.5MW one sited at San Carlos de Bariloche city,<br />

Province of Río Negro, Argentina. During 2008 following tasks took place:<br />

• Transport of the new LEU core from the ECRI plant sited at the Constituyentes<br />

Atomic Center (close to Buenos Aires City) to the RA-6 reactor building. This new<br />

core is made of 25 regular and control fuel assemblies with a dispersion of U3Si2<br />

and Al powders, 4.8 gU/cm3 density, Cd wires were employed as neutron<br />

absorbers.<br />

• Preliminary tests for loading the new core started in September 18 th , 2008.<br />

• Criticality start-up operations, started on January 19 th , <strong>2009</strong>.<br />

• Formal re-inauguration took place on March 16 th , <strong>2009</strong><br />

This last operation completes the successful conversion process started in October 30 th ,<br />

2005 with the signature of two contracts between CNEA and NNSA-DoE and comprised<br />

swapping of HEU-LEU inventories, exportation of HEU SNF US-origin to USA, and<br />

fabrication of the conversion core and new graphite reflectors and improvements on<br />

primary and secondary loops.<br />

2. Applied R&D on dispersed and monolithic U-Mo fuels.<br />

• New results from out-of-pile tests using high intensity synchrotron X-rays diffraction<br />

techniques performed in the LNLS Campinas, Brazil are presented. Characterization<br />

of phases in the interaction layer, after 340ºC and 550ºC temperature treatment in<br />

diffusion couple samples of U-Mo(-Zr) / Al(-Si) were optimized.<br />

3. Development and irradiation of promissory solutions to VHD monolithic<br />

and dispersed fuels technical problems<br />

• Some improvements were done in the development of dispersed and monolithic<br />

fuels made with Uranium-molybdenum alloy. The purpose is to have additional<br />

alternatives to cover HEU-LEU conversion possibilities.<br />

• The IAEA’s Technical Cooperation, the project ARG/4/092 to irradiate and PIE in a<br />

high flux reactor a full scale fuel assembly prototype finished the tender process<br />

and a provider was selected.<br />

23 of 455

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!