Figures 11 and 12 show local views of a standard fuel assembly (figure 11) and of the<br />

assembly able to be easily dismantled for EOLE (figure 12).<br />

Surface treated stiffener<br />

Lateral<br />

comb<br />

Figure 11 – Sketch of a standard fuel<br />

assembly<br />

Figure 12 – Sketch of the fuel assembly able<br />

to be easily dismantled<br />

4. Project schedule<br />

LTA's manufacturing for JHR fuel qualification program schedule<br />

2006<br />

2007 2008<br />

<strong>2009</strong><br />

Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June<br />

Contract between CEA and CERCA<br />

♦<br />

Preliminary study<br />

CEA / CERCA / AREVA TA meetings<br />

for project review<br />

♦ ♦ ♦ ♦ ♦ ♦ ♦<br />

poison plate qualification<br />

Fuel plate qualification<br />

technical specification validation ♦ ♦ ♦<br />

structural parts supplying<br />

poison plate manufacturing<br />

Fuel plate manufacturing<br />

Fuel element manufacturing<br />

1st EVITA fuel element witness<br />

inspection<br />

♦<br />

4 EVITA fuel elements witness<br />

inspection<br />

♦<br />

7 AMMON fuel elements witness<br />

inspection<br />

♦<br />

The project is still running; the first EVITA fuel element has been delivered in due time to<br />

BR2 reactor beginning of January <strong>2009</strong>, next step is the witness inspection for the last 4<br />

EVITA fuel elements scheduled in March.<br />

This project schedule shows the last phase of JHR fuel qualification program, relative to<br />

the fuel plate manufacturing developments; but, previously to this phase, technical and<br />

design evaluation developments were successfully carried out, through a close<br />

collaboration between: the designer (AREVA-TA), the manufacturer (AREVA-CERCA) and<br />

97 of 455