Page 7 of 7<br />

DATE DESCRIPTION DATE DESCRIPTION<br />

1996-<br />

2000<br />

Upgraded all fluid drive couplings to soft<br />

starters, ventilation fans, cooling tower fans,<br />

pool pump.<br />

1996 High-density storage racks for spent fuel<br />

modified to overcome electrolytic corrosion<br />

problem.<br />

2007 Upgraded the standby compressor from a two<br />

stage piston compressor to a worm compressor<br />

with built in cooling and moisture removal.<br />

2007 Upgraded the air drier to a modern automated<br />

system.<br />

1997 Installed new 16N channel for testing. 2007 Stripped and re-coated the process wing floors<br />

with an industrial epoxy coating, This upgrade<br />

removed the need to polish and strip the floors<br />

regularly, thus reducing the quantity of chemical<br />

waste.<br />

1997 Installed a “Multilink” SCADA system. 2007 An industrial network on a fibre-optic backbone<br />

which is separated from the campus network was<br />

installed. This network will be commissioned in<br />

2008, and will consist of a fully redundant server<br />

system and will enable the automation of various<br />

manual tasks operations.<br />

1997 Installed a ring intercom system throughout<br />

the plant.<br />

1997 Installed isotope production (IPR) thimble in<br />

core position B8.<br />

2007 The Adroit Scada system was upgraded from a<br />

750 scan point license to unlimited scan points.<br />

This was required for the Industrial network<br />

installation and implementation.<br />

2002-<br />

2006<br />

Stuck collimator in BT no 1. Equipment developed<br />

and collimator successfully removed. Deformation<br />

noticed in beam tube. BT still sound<br />

1998 Upgraded reactor hall crane to PLC control. 2003 ‘Filter house’ was erected over filter pits on top of<br />

exhaust fan yard to facilitate all-weather filter<br />

replacement and improved contamination control<br />

1998 Upgraded clock displays and synchronized<br />

all clocks and PC’s to national time standard.<br />

1998 Instrumented primary pumps for temperature<br />

and pressure monitoring.<br />

2006-<br />

2007<br />

1998 Upgraded water chemistry monitors. 2007-<br />

2008<br />

1998 Replaced Isotope Production Thimble in<br />

core position B8 with a 99Mo production<br />

Thimble.<br />

1998 Conducted qualification tests on 300g fuel<br />

elements.<br />

1998 Upgraded cooling tower inlet/outlet valves to<br />

pneumatic actuators.<br />

1999 Upgraded “Multilink” data log system to<br />

“Adroit” system with remote access and up<br />

to 750 parameters.<br />

All accesses to radiological controlled areas fitted<br />

with automated full-body contamination monitors.<br />

2003 A second, back-up degasifier pump installed.<br />

Stuck collimator BT no 5 removed successfully.<br />

Deformation in beam tube noticed. Beam tube still<br />

sound.<br />

2008 Replaced control drives motors and refurbishes<br />

electrical panels.<br />

2008 Refurbishment of cooling tower fill and structure.<br />

2008 Replacement of two Neutron Safety Channel<br />

detectors and cables. Purchased spares<br />

2008/9 Core conversion to LEU fuel started. Still in<br />

progress.<br />