26.04.2014 Views

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

View - The Municipality of Lambton Shores

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

THE MUNICIPALITY OF LAMBTON SHORES<br />

CL Report No. 83-2012 Wednesday, July 4, 2012<br />

TO:<br />

FROM:<br />

RE:<br />

Mayor Weber and Members <strong>of</strong> Council<br />

Carol McKenzie, Clerk<br />

Building Permit – Greenhouse Operation – Northville Road<br />

RECOMMENDATION:<br />

For Council’s consideration<br />

REPORT<br />

At the July 9, 2010 meeting, Council will hear a delegation from the owner <strong>of</strong> property<br />

on Northville Road that is planning the construction <strong>of</strong> a greenhouse that will be used to<br />

grow red peppers for the wholesale market.<br />

As noted in the attached letter, the current <strong>Lambton</strong> <strong>Shores</strong> building permit fee for<br />

agricultural buildings is calculated on the gross floor area <strong>of</strong> the building and is charged<br />

at $ 2.00 a square metre, which is considerably less than the $ 9.00 per square metre<br />

for residential, commercial and industrial buildings. When the $ 2.00 per square metre is<br />

used for this project, the permit fee is over $ 45,000.00 for the 22, 590 square metre<br />

building.<br />

<strong>The</strong> property owner is requesting relief from the building permit charge, and noted that<br />

the building plans are stamped by an engineer, which takes some <strong>of</strong> the responsibility<br />

from the municipal staff as the engineer is required to ensure that the building is<br />

constructed as per the drawings.<br />

Included in the submission is sample permit fees from other municipalities and the fees<br />

range from $ 400.00 to $ 6,620.00. Fees charged in the <strong>Municipality</strong> <strong>of</strong> South Huron<br />

were investigated, and the most recent greenhouse permit fee was $.10 per square<br />

foot, which equates to approximately $ 1.07 per square metre, which for this project<br />

would see a permit fee <strong>of</strong> $ 24,171.36.<br />

<strong>The</strong> purpose <strong>of</strong> the permit fee is to cover the time expended by municipal staff for the<br />

project, and this staff time includes not only that <strong>of</strong> the building inspector, but also the<br />

administrative staff that prepare the permit and undertake the mandatory reporting, and<br />

the Treasury staff that follow up to ensure that the building is assessed in a timely<br />

manner.<br />

It is acknowledged that the current permit fee for agricultural structures when applied to<br />

this size <strong>of</strong> a structure is excessive for the staff time required for the project. One<br />

suggestion for a more equitable fee for greenhouses and other similar engineered<br />

265

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!