That a request from Jessica Thwaites and Trevor Dier<strong>of</strong>f to have a<br />

tent at 6504 West Parkway Drive for a wedding taking place June<br />

8, 2013 be referred to staff for approval. Carried<br />

8. CONSIDERATION OF COMMITTEE MINTUES AND STAFF REPORTS<br />

Planning<br />

PL Report No. 08-2012 regarding Cash-in-Lieu <strong>of</strong> Parking was dealt with during the<br />

public portion <strong>of</strong> the meeting.<br />

8.2 PL Report No. 17-2012 – Re: Planning and Development Review<br />

A brief summary <strong>of</strong> the current planning and development activity within the <strong>Municipality</strong><br />

was provided in PL Report No. 17-2012.<br />

12-0618-15 Moved by: Councillor Underwood<br />

Seconded by: Councillor Maguire<br />

That PL Report No. 17-2012 regarding a review <strong>of</strong> <strong>Lambton</strong><br />

<strong>Shores</strong>’ planning and development be received and filed.<br />

Carried<br />

8.3 PL Report No. 18-2012 – Re: Revised Draft Plan <strong>of</strong> File No. 38T-03001 (LS) –<br />

Phase 2<br />

Further to conditions imposed in the Draft Plan <strong>of</strong> Subdivision 38T-03001(LS), the<br />

developer Mr. Johnstone has requested several revisions to the standard requirements<br />

that were listed in the draft agreement proposed by the <strong>Municipality</strong>.<br />

Planner Ms. Richardson reported that Section 4(b) <strong>of</strong> the draft agreement requires that<br />

construction <strong>of</strong> the Subdivision commence within 1 year <strong>of</strong> the execution <strong>of</strong> the<br />

agreement and be completed within 24 months <strong>of</strong> that execution <strong>of</strong> the subdivision<br />

agreement and Mr. Johnstone is requesting that the time frame to commence<br />

construction be 3 years instead <strong>of</strong> the one.<br />

Ms. Richardson further asked for Council direction respecting a revision to the reserving<br />

<strong>of</strong> sewage capacity from 24 months to 36 months, some consideration on how the<br />

estimated construction costs were derived, the elimination <strong>of</strong> a separate deposit for asconstructed<br />

drawings and that the costs associated with the revised bridge construction<br />

be a municipal responsibility.<br />

A brief debate occurred on the need for the pedestrian bridge within the subdivision and<br />

how it would be an asset to the <strong>Municipality</strong> as a pedestrian bypass; however, it was<br />

noted that costs have not been determined and a decision on possible cost sharing<br />

should be reserved until those figures have been determined.<br />

12-0618-16 Moved by: Councillor Illman<br />

Seconded by: Councillor Maguire<br />