Project Requests- Annual Review-Ranked 1<br />
Cyclical Capital Renewal New Items<br />
Facility Project Name Scope of Work Estimated Cost ($)<br />
Administration/<strong>County</strong> Office Replace 8 - Doors/Frames - Buildings 01 & 02 Remove and replace exterior doors that are cast into the masonry, and have rusted out. Some<br />
doors rusted bad enough that is allowing water intrusion.<br />
48,000.00<br />
Boggy Creek Elementary Cyclical HVAC System Replacement HVAC Renewal for building 2. Cyclical Capital Renewal item scheduled for replacement at end of<br />
its useful life. Scope to include remove and replace all mechanical equipment to include chiller,<br />
Fan Coil Units, duct work, ceiling grid, ceiling tiles, controls, and associated piping as needed.<br />
500,000.00<br />
Celebration High Site Drainage Softball Field/Athletic Facilities Site work required to correct a drainage problem on the softball field. 80,000.00<br />
Celebration High Correct ground water intrusion problems Repair underground piping that has failed under the concrete at the cafeteria enterance.<br />
30,000.00<br />
Celebration K-8 Trash Compactor Replacement Compactor has rusted through in several places, and is no longer repairable 25,000.00<br />
Celebration K-8 Replace Gutter System- All Buildings Gutters are rusted out, and staining the building exteriors.<br />
30,000.00<br />
Celebration K-8 Pressure Wash/Paint Exterior Pressure wash the exterior to remove the mold stains left by the leaking gutters, and perform<br />
selective exterior re-painting 30,000.00<br />
Central Avenue Elementary Paint Exterior Doors - Building 1 Paint is faded and chalking on all exterior doors and trim. 5,000.00<br />
Central Avenue Elementary Trash Compactor Replacement Compactor has rusted through, and the hydraulics are failing 25,000.00<br />
Cypress Elementary Safety Door To install a wall and door to aid inprohibiting unauthorized visitors from entering and walking<br />
around campus before checking in to the office. Will include required panic hardware, exit signs,<br />
and sprinkler system modifications. 25,000.00<br />
Cypress Elementary J Vent Replacements - Building 1 Vent has blown off roof several times, which has damaged the vents to the point that they need to<br />
be replaced with a heavier gauge material, and a modified attachment system to prevent<br />
reoccurance. 20,000.00<br />
Denn John Middle Carpet - High Traffic Area/Guidance - Building 1 Carpet is worn in these areas, and seams are separating, creating trip hazards.<br />
25,000.00<br />
Denn John Middle Parking lot expansion Fence off existing basketball court not used that has black top. Paint parking lines so it can be used<br />
for additional staff parking. 10,000.00<br />
Discovery Intermediate Carpet - Media Center - Building 1 Original carpet in this area needs to be replaced due to being thread bear and worn out. Will cause<br />
tripping hazard if not replaced soon.<br />
10,000.00<br />
Discovery Intermediate Replacement of 3 Chillers - All Buildings Chiller units are 15+ years old and the downtime due to repairs is becoming critical. Also, the<br />
efficiency of these units is down. These unit have seriously eroding condenser coils<br />
550,000.00<br />
Flora Ridge Elementary Install Covered Walkway at Front Door Additional covered walkway at the the front door to help with the passage of rainwater.<br />
30,000.00<br />
Harmony Community <strong>School</strong> Traffic Exiting Radius Re-work campus traffic patterns at campus for greater functionality. 40,000.00<br />
Hickory Tree Elementary Restroom Renovation Replace tile throughout restroom. Also replace sinks, toilets, and partitions. This scope of work is<br />
limited to two restrooms in effort to understand the total scope required and actual cost, per<br />
restroom. 80,000.00<br />
<strong>2013</strong> Educational <strong>Technology</strong> <strong>Plan</strong> 9/26 <strong>School</strong> <strong>District</strong> of <strong>Osceola</strong> <strong>County</strong> Florida