Facility Project Name Scope of Work Estimated Cost ($)<br />

Horizon Middle Exterior Lighting Replace all existing and failing exterior lighting campus wide with more efficient lighting. Lighting<br />

has failed due to water intrusion into the fixtures. 60,000.00<br />

Horizon Middle Design- PVC Chilled Water Line Replacement Because of funding shortfalls in the capital budget, we cannot fund the replacement of the failing<br />

PVC chilled water lines at this campus. We would like to fund the design,so that we will be in a<br />

position to revisit this project in the spring of next year, and possibly do the replacement next<br />

summer. 40,000.00<br />

Horizon Middle Refurbish Cafeteria Toilet Rooms Replace mirrors, sinks, fixtures, and deteriorated counter tops, and replace the inner, louvered<br />

door. Steam clean and seal floors 30,000.00<br />

Horizon Middle Refurbish Group Toilets (12) Replace mirrors, sinks, fixtures, and counter tops in 12 restrooms. 80,000.00<br />

Horizon Middle Pressure Washing Exterior surface of the campus is unpainted split face block. It is supporting mold growth and we<br />

need to pressure wash the exterior of all the buildings. 15,000.00<br />

Kissimmee Middle Pressure Washing Exterior surface of the campus is unpainted split face block. It is supporting mold growth and we<br />

need to pressure wash the exterior of all the buildings. 15,000.00<br />

Lakeview Elementary Restroom Renovation Flooring in restroom must be removed and replaced. Flooring in these areas is sheet vinyl, and<br />

has cracked in the room corners, and is causing large odor issues. 40,000.00<br />

Liberty High Fire Road Access for Rejuvenation Repair and upgrade fire road for ESE student drop off. This was a limerock road that was intended<br />

for emergency use only, but is being used by the campus for ESE student drop off.<br />

30,000.00<br />

Narcoossee Middle Carpeting- Media Center New carpeting in the media center. Carpet is very thin and failing. 20,000.00<br />

Narcoossee Middle PVC Chilled Water Lines - All Buildings Replace all PVC chilled water distribution piping campus wide with pre-insulated steel pipe due to<br />

numerous leaks. These leaks cause significant campus down time and disruption, and large, non<br />

reuseable repair costs. 460,000.00<br />

Neptune Middle Paint/Seal Roof - All Buildings Major repairs are needed on the basketball courts. Serious cracks are casing a trip hazard and<br />

needs attention. 150,000.00<br />

Neptune Middle Basketball Courts Major repairs are needed on the basketball courts. 60,000.00<br />

Pleasant Hill Elementary Communication Closet Expansion- MDF Demolition of one existing wall to allow expansion into adjacent room and adding a<br />

new wall to increase the size of the Main Distribution Frame (MDF). This work also includes the<br />

installation of backboard and power receptacles, as needed, to support the expansion.<br />

25,000.00<br />

Poinciana Elementary Gutter Replacement - All Buildings Replace all gutters as they are rusted beyond repair. 50,000.00<br />

Poinciana High Exterior Lighting Controls to Auditorium Re-work lighting due to numerous wiring failures. Lot has limited lighting working causing safety<br />

issues. 20,000.00<br />

Poinciana High Culinary Arts Training Kitchen This funding is to supplement grant funding to create a culinary arts training kitchen at this high<br />

school. 400,000.00<br />

Poinciana High Student Parking Lot Lighting 50,000.00<br />

Reedy Creek Elementary Reroof buildings 2 and 3 Emergency roof replacement project. Roof is leaking badly causing IAQ issues if not taken care of<br />

soon. 150,000.00<br />

St. Cloud Middle Painting - 2-Story Building (Exterior) Pressure wash and paint the exterior of the 2-Story Building. 30,000.00<br />

TECO New Carpet Replace old carpet in Admin area due to carpet being worn very thin and failing. 20,000.00<br />

TECO Replace Section of Carpet with Tile Remove a 15 x 30 section of carpet and replace with tile in the Nursing area to support program<br />

needs. 5,000.00<br />

<strong>2013</strong> Educational <strong>Technology</strong> <strong>Plan</strong> 10/26 <strong>School</strong> <strong>District</strong> of <strong>Osceola</strong> <strong>County</strong> Florida