assessment of the socio-economic and environmental impact
assessment of the socio-economic and environmental impact
assessment of the socio-economic and environmental impact
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The preliminary estimate <strong>of</strong> <strong>the</strong> damage caused by Hurricane Dean is $17.2 million (Table 3.12).<br />
Approximately 50 per cent <strong>of</strong> <strong>the</strong> sum is required immediately in order to return a reasonable<br />
level <strong>of</strong> service.<br />
Table 3.12: Estimated Recovery Cost ($ million) Resulting from Hurricane Dean<br />
Head<br />
Office<br />
St.<br />
Thomas<br />
Source: National Irrigation Commission (NIC)<br />
St.<br />
Ca<strong>the</strong>rine<br />
St.<br />
Elizabeth Trelawny TOTAL<br />
Clarendon<br />
Irrigation<br />
Work 0.15 2.2 1.8 0.25 0.15 4.55<br />
Drainage<br />
Structure 0.3 0.4 2.8 3.50<br />
Access<br />
Roads 0.1 1.2 1.1 1.6 4.00<br />
Pumps <strong>and</strong><br />
Electrical<br />
Equipment<br />
0.1 1.5 1.8 0.3 0.15 3.85<br />
Offices <strong>and</strong> 0.25 0 0.6 0.15 0.3 1.30<br />
o<strong>the</strong>r<br />
Buildings<br />
TOTAL 0.25 0.35 5.8 5.25 5.25 0.30 17.30<br />
11. Mining<br />
The bauxite <strong>and</strong> alumina sector was directly <strong>and</strong> indirectly affected by Hurricane Dean. A<br />
Preliminary estimate <strong>of</strong> losses for <strong>the</strong> industry as a whole is set at a minimum <strong>of</strong> approximately<br />
US$29 million. In terms <strong>of</strong> <strong>the</strong> direct <strong>impact</strong>, <strong>the</strong> JAMALCO refinery sustained severe damage<br />
to its port at Rocky Point. Due to <strong>the</strong> damage <strong>the</strong> plant will be unable to export from that port<br />
until repairs are carried out. The port will require significant repairs <strong>and</strong> temporary logistical<br />
support for shipping alumina while repair work is being undertaken. This work includes<br />
preparing storage for alumina which is currently limiting production to 50.0 percent <strong>of</strong> capacity,<br />
with full operation anticipated by early November. Taking into consideration insurance<br />
coverage, <strong>the</strong> total Jamalco <strong>impact</strong> from <strong>the</strong> hurricane – including lost production, business<br />
interruption <strong>and</strong> repairs is estimated to be US$10.0 million after-tax.<br />
The WINDALCO refinery sustained damage to a turbine at <strong>the</strong> Ewarton Plant. In terms <strong>of</strong><br />
indirect <strong>impact</strong>, all refineries <strong>and</strong> <strong>the</strong> St. Ann Bauxite Company lost production time due to <strong>the</strong><br />
41