Table 4.2.: List <strong>of</strong> Facilities out <strong>of</strong> operation due to <strong>the</strong> effects <strong>of</strong> Hurricane Dean<br />
No. System Source Areas normally served Remarks<br />
KINGSTON & ST. ANDREW<br />
1 Mahoney Spring Mahoney, Rose Hall, Lawrence Electrical problem exists.<br />
Tavern, Cassava River, Mount Olive,<br />
Assett Hill.<br />
ST CATHERINE<br />
1 Cocoa Ridge /<br />
Goldmine T/P<br />
Filter Plant Bodose Hill, Bellas Gate, Cocoa<br />
Ridge, S<strong>and</strong> Hole, Rhule Town.<br />
Roadway impassible.<br />
JPSCo. Low Voltage.<br />
Planters, S<strong>and</strong>y Ground, Bellfield,<br />
Marlie Hill, Joe Ground, Bamboo<br />
Ridge, Bartons, Wood Hall, Browns<br />
Hall, Blue Hole, Macca Tree<br />
PORTLAND<br />
1 Seaman’s Spring<br />
Seamans Valley<br />
System partially restored - 90%.<br />
Valley<br />
900 m <strong>of</strong> pipeline from source<br />
dislocated/damaged.<br />
Complete service is scheduled to<br />
be restored by October 2007.<br />
2 Long Bay Spring<br />
Long Bay, Long Bay Pen, Rose Restoration <strong>of</strong> service is at 95%.<br />
Garden, Rural Hill, Elmwood New pipelines along roadway<br />
have been laid.<br />
# <strong>of</strong> Systems out <strong>of</strong> operations 4<br />
Source: NWC Report on <strong>the</strong> Status <strong>of</strong> Water Supply Systems Due to Hurricane Dean, October 08, 2007<br />