15.06.2014 Views

comprehensive site investigation and remediation objectives report

comprehensive site investigation and remediation objectives report

comprehensive site investigation and remediation objectives report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MW-9<br />

Asphalt Parking Lot<br />

Sanitary Sewer<br />

SM-GP-18<br />

Watermain<br />

SG-11<br />

SM-GP-17<br />

SM-GP-15<br />

Overhang<br />

SM-GP-16<br />

SG-12<br />

MW-10<br />

Independence Boulevard<br />

Chinese<br />

Buffet<br />

SG-05<br />

Mrs<br />

Clean<br />

SM-GP-01<br />

SG-06<br />

Vacant<br />

SM-GP-02<br />

Subway/<br />

Multi-<br />

Tenant<br />

Floor Drain<br />

SG-02<br />

SG-07<br />

SG-27<br />

SM-GP-03<br />

Floor Drain<br />

SG-26<br />

SG-13<br />

SG-10SG-09<br />

SG-25<br />

SG-08<br />

Floor Drain<br />

SM-GP-04 SM-GP-06<br />

SM-GP-05SG-03<br />

SG-01 SG-04 SG-14<br />

Floor Drain<br />

SG-19 SG-18<br />

SG-22SM-GP-09<br />

SM-GP-07<br />

SM-GP-08<br />

SG-20<br />

Grass<br />

Watermain<br />

Sanitary Sewer<br />

SG-23<br />

SG-21<br />

SG-24<br />

SG-16<br />

Sanitary Sewer<br />

Asphalt Parking Lot<br />

SG-15<br />

SG-17<br />

Grass<br />

Watermain<br />

Alex<strong>and</strong>er Circle<br />

LEGEND<br />

SG-08<br />

PASSIVE SOIL-GAS SAMPLE LOCATION<br />

V3 SOIL BORING<br />

SM-GP-01<br />

V3 SOIL BORING/<br />

SM-GP-09 TEMPORARY MONITORING WELL<br />

MW-10<br />

ERS PERMANENT MONITORING WELL/<br />

EAST ADJACENT LUST<br />

Scale in Feet<br />

Figure 1<br />

Passive Soil-Gas Survey<br />

Sample Locations<br />

323 Williams Street, Suite D, Bel Air, MD, 800-878-5510<br />

Beacon Project No. 2096, August 2008<br />

0<br />

30<br />

60<br />

Dry Cleaner<br />

Romeoville, IL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!