15.06.2014 Views

comprehensive site investigation and remediation objectives report

comprehensive site investigation and remediation objectives report

comprehensive site investigation and remediation objectives report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MW-9<br />

Asphalt Parking Lot<br />

Sanitary Sewer<br />

SM-GP-18<br />

11,643<br />

SG-11<br />

Watermain<br />

SM-GP-17<br />

Area shown in<br />

greater detail<br />

in Figure 3-2<br />

Chinese<br />

Buffet<br />

SM-GP-15<br />

Overhang<br />

SG-05<br />

Mrs<br />

Clean<br />

SM-GP-01<br />

SG-06<br />

Vacant<br />

SM-GP-02<br />

SM-GP-16<br />

Subway/<br />

Multi-<br />

Tenant<br />

6,402<br />

SG-12<br />

MW-10<br />

Independence Boulevard<br />

150,000<br />

Floor Drain<br />

4,077<br />

SG-27<br />

SG-02 SG-07<br />

SM-GP-03<br />

5,454<br />

SG-26<br />

11,421<br />

SG-13 Floor Drain<br />

SG-10SG-09<br />

SG-25<br />

SG-08<br />

Floor Drain<br />

Floor Drain<br />

SM-GP-04 SM-GP-06<br />

149,146<br />

SM-GP-05SG-03<br />

SG-01 SG-04 SG-14<br />

4,367<br />

10,854<br />

SG-19 SG-18<br />

SG-22SM-GP-09<br />

SM-GP-07<br />

9,660<br />

SM-GP-08<br />

SG-20<br />

Grass<br />

140,000<br />

130,000<br />

120,000<br />

110,000<br />

100,000<br />

90,000<br />

80,000<br />

70,000<br />

60,000<br />

8,457<br />

SG-24<br />

3,746<br />

SG-23<br />

Watermain<br />

SG-21<br />

SG-16<br />

Sanitary Sewer<br />

50,000<br />

40,000<br />

30,000<br />

20,000<br />

10,000<br />

Sanitary Sewer<br />

Asphalt Parking Lot<br />

SG-15<br />

0<br />

Color Scale<br />

(nanograms)<br />

SG-17<br />

Grass<br />

Watermain<br />

LEGEND<br />

Alex<strong>and</strong>er Circle<br />

100 TOTAL PETROLEUM HYDROCARBONS C5-C9 (nanograms)<br />

SG-08<br />

PASSIVE SOIL-GAS SAMPLE LOCATION<br />

V3 SOIL BORING<br />

SM-GP-01<br />

V3 SOIL BORING/<br />

SM-GP-09 TEMPORARY MONITORING WELL<br />

MW-10<br />

ERS PERMANENT MONITORING WELL/<br />

EAST ADJACENT LUST<br />

Scale in Feet<br />

Figure 3-1<br />

Passive Soil-Gas Survey<br />

TPH C5-C9<br />

323 Williams Street, Suite D, Bel Air, MD, 800-878-5510<br />

Beacon Project No. 2096, August 2008<br />

0<br />

30<br />

60<br />

Dry Cleaner<br />

Romeoville, IL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!