Chapter 9 FOUNDATION ENGINEERING<br />

(e) Presence or otherwise of a ground-bearing cap, <strong>and</strong><br />

(f) Relative stiffness of the structure, the piles <strong>and</strong> the ground.<br />

Traditionally, the assessment of group effects is based on some 'rules-of-thumb' or semiempirical<br />

rules derived from field observations. Recent advances in analytical studies have<br />

enabled more rational design principles to be developed. With improved computing capabilities,<br />

general pile groups with a combination of vertical <strong>and</strong> raking piles subjected to complex loading<br />

can be analysed in a fairly rigorous manner <strong>and</strong> parametric studies can be carried out relatively<br />

efficiently <strong>and</strong> economically.<br />

9.4.2 Minimum Spacing of Piles<br />

The minimum spacing between piles in a group should be chosen in relation to the method of<br />

pile construction <strong>and</strong> the mode of load transfer. It is recommended that the following<br />

guidelines on minimum pile spacing may be adopted for routine design:<br />

(a) For bored piles which derive their capacities mainly from shaft resistance <strong>and</strong> for all types<br />

of driven piles, minimum centre-to-centre spacing should be greater than the perimeter of the pile<br />

(which should be taken as that of the larger pile where piles of different sizes are used); this<br />

spacing should not be less than 1 m as stipulated in the Code of Practice for Foundations (BD,<br />

2004a).<br />

(b) For bored piles which derive their capacities mainly from end-bearing, minimum clear spacing<br />

between the surfaces of adjacent piles should be based on practical considerations of positional <strong>and</strong><br />

verticality tolerances of piles. It is prudent to provide a nominal minimum clear spacing of about<br />

0.5 m between shaft surfaces or edge of bell-outs. For mini-piles socketed into rock, the minimum<br />

spacing should be taken as the greater of 0.75 m or twice the pile diameter (BD, 2004a).<br />

The recommended tolerances of installed piles are shown in Table 9.6 (HKG, 1992). Closer<br />

spacing than that given above may be adopted only when it has been justified by detailed<br />

analyses of the effect on the settlement <strong>and</strong> bearing capacity of the pile group. Particular<br />

note should be taken of adjacent piles founded at different levels, in which case the effects of the<br />

load transfer <strong>and</strong> soil deformations arising from the piles at a higher level on those at a lower<br />

level need to be examined. The designer should also specify a pile installation sequence within a<br />

group that will assure maximum spacing between shafts being installed <strong>and</strong> those recently<br />

concreted.<br />

Table 9.6 Tolerance of Installed Piles<br />

Description<br />

Tolerance<br />

L<strong>and</strong> Piles Marine Piles<br />

Deviation from specified position in plan,<br />

measured at cut-off level<br />

75 mm 150 mm<br />

Deviation from vertical 1 in 75 1 in 25<br />

Deviation of raking piles from specified batter<br />

Deviation from specified cut-off level<br />

1 in 25<br />

25 mm<br />

The diameter of cast in-place piles shall be at least 97% of the specified diameter<br />

9.4.3 Ultimate Capacity of Pile Groups<br />

Traditionally, the ultimate load capacity of a pile group is related to the sum of ultimate capacity of<br />

individual piles through a group efficiency (or reduction) factor, η, defined as follows:<br />