Chapter 1 PLANNING AND SCOPE<br />

Table 1.1 Planning a Ground <strong>Investigation</strong><br />

Stage Action Responsibility of<br />

I Obtain the services of an experienced geotechnical Developer or client<br />

specialist<br />

II Carry out desk study <strong>and</strong> air photograph or LIDAR (if <strong>Geotechnical</strong> specialist<br />

available) interpretation to determine the probable<br />

ground conditions at the site<br />

III Conceptual design: optimize construction to minimize<br />

geotechnical risk<br />

Architect, structural engineer,<br />

geotechnical specialist<br />

IV Identify parameters required for detailed <strong>Geotechnical</strong> specialist<br />

geotechnical calculations<br />

V Plan ground investigation to determine ground <strong>Geotechnical</strong> specialist<br />

conditions, <strong>and</strong> their variation, <strong>and</strong> to obtain<br />

geotechnical parameters.<br />

VI Define methods of investigation <strong>and</strong> testing to be <strong>Geotechnical</strong> specialist<br />

used<br />

VII Determine minimum acceptable st<strong>and</strong>ards for <strong>Geotechnical</strong> specialist<br />

ground investigation work<br />

VIII Identify suitable methods of procurement <strong>Geotechnical</strong> specialist, lead<br />

professional<br />

design, developer or client<br />

1.6.1 Spacing of Pits <strong>and</strong> Borings<br />

The required spacing depends very much on the size <strong>and</strong> type of the project <strong>and</strong> on the terrain <strong>and</strong><br />

subsurface conditions. For a start, borings should initially be widely spaced <strong>and</strong> subsequently,<br />

intermediate borings can be carried out as required, so that sections can be drawn with reasonable<br />

accuracy. In uniform conditions, spacing may be 25m to 150m or more but spacings of 10m or less<br />

may be required to examine detailed problems <strong>and</strong> or or in erratic conditions. Examples of typical<br />

spacing requirements are given in Table 1.2 <strong>and</strong> illustrated in Fig 1.1. Where structures are to be<br />

founded on slopes, the overall stability of the structure <strong>and</strong> the slope must obviously be investigated,<br />

<strong>and</strong> to this end a deep borehole near the top of the slope will be very useful.<br />

It must be emphasised however, that the requirements of individual sites may vary considerably<br />

from those given.<br />