31.10.2014 Views

Volume 6 – Geotechnical Manual, Site Investigation and Engineering ...

Volume 6 – Geotechnical Manual, Site Investigation and Engineering ...

Volume 6 – Geotechnical Manual, Site Investigation and Engineering ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 1 GEOMATICS AND LAND SURVEY SERVICES<br />

1.5.4 Economy <strong>and</strong> Accuracy<br />

It is important, before any field survey operation is started, to weigh the accuracy against the time,<br />

resources <strong>and</strong> costs. The greater the accuracy required, the greater the cost of operation. Since<br />

accuracy depends upon the elimination or reduction of errors, it is essential that the surveyor<br />

underst<strong>and</strong>s the nature of the errors <strong>and</strong> plans his works in such a way to reduce them to acceptable<br />

levels to meet the misclosure tolerances adopted.<br />

1.5.5 The Independent Check<br />

In every survey operation it is the responsibility of a surveyor to do a check. It is best to employ a<br />

system which is completely self checking. Where this is not possible the check applied should be as<br />

independent as possible <strong>and</strong> not just a repetition of the previous operation. For example, if the<br />

measurement of the length is carried out, the check applied should be made by measuring the<br />

distance again using different unit of length or measuring in the reverse direction. In many cases a<br />

rough check is very useful <strong>and</strong> sometime all that is required. Computations which are not self<br />

checking should be completed by another survey staff including, using, if possible, methods other<br />

than those used.<br />

1.5.6 Safeguarding<br />

Marks established by the field surveyor for the horizontal <strong>and</strong> vertical control framework should be as<br />

permanent as possible or easily re-established from nearby marks. Liaison with Agricultural<br />

Department may be considered during planning for topographical surveys to coordinate simultaneous<br />

concurrent activities to collect water <strong>and</strong> soil test samples to determine their suitability for crop<br />

cultivation. Hydrological stations for systematic collection of data such as rainfall, stream flow,<br />

maximum flood levels, tidal range, etc. should also be considered.<br />

1-4 March 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!