design features such as energy generating technology at the site, inclusion <strong>of</strong><br />

highly efficient systems for HVAC and lighting, water conservation, use <strong>of</strong><br />

recycled and renewable materials, and strict guidelines for diversion <strong>of</strong> waste<br />

materials from landfill. The project will follow and meet the requirements for<br />

California High Performance Schools (CHPS).<br />

The structural engineers have done a very thorough analysis <strong>of</strong> the proposed<br />

concept, and have prepared preliminary BIM studies <strong>of</strong> a steel frame system<br />

which also allows for future vertical expansion. These diagrams, along with<br />

preliminary calculation assumptions, are included in the outline specification.<br />

Initial reports from mechanical, civil, landscape, electrical, and pool consultants<br />

are also incorporated into this document. There are certainly many items which<br />

have not yet been addressed, but we have tried to incorporate as many special<br />

needs, such as gymnasium and kitchen equipment, library shelving, and audiovisual<br />

systems, as could be anticipated based upon this level <strong>of</strong> design.<br />

It should also be noted that this project will fall under the jurisdiction <strong>of</strong> the DSA,<br />

and will require an onsite special inspector.<br />

6. Estimated Project Costs<br />

The construction cost estimating firm <strong>of</strong> Leland Saylor and Associates was<br />

retained to do two cost estimate reports during the course <strong>of</strong> this master<br />

planning effort. After receipt <strong>of</strong> the first estimate, the project finance committee<br />

did an assessment <strong>of</strong> the potential funding that could become available for the<br />

project, and determined that the scope had to be scaled back. The second<br />

estimate was based on the final conceptual design, as illustrated in chapter 7 <strong>of</strong><br />

the master plan report.<br />

A more complete project cost estimate was then prepared, using the<br />

construction cost estimate as its basis. The summarized project cost estimate,<br />

and complete final concept design construction cost study are included in<br />

chapter 9 <strong>of</strong> the master plan report.<br />

The major costs are estimated as follows:<br />

Construction (including escalation to Aug 2011) $89,314,738