o Local Architect 1<br />

o<br />

account the shared use. Most notably, the shared classrooms are<br />

larger than a standard classroom to accommodate the extra storage<br />

space needed for multiple uses.<br />

As an example, the Jewish <strong>Community</strong> <strong>Center</strong> in Marin is same<br />

‘shared use’ style <strong>of</strong> school and community center. It has been in<br />

existence roughly 10 years and has been very successful.<br />

Statement: Please design the building to not look so plain. Add some<br />

historical designs that reflect <strong>Emeryville</strong>’s character and nice architecture.<br />

o Local Architect 2<br />

o The designs are beautiful. Will the gym and pool have an indoor or<br />

outdoor transition?<br />

Not sure, this will be completed in the architectural designs.<br />

o Can we see some <strong>of</strong> the room on the street level design?<br />

There are conceptual drawings that show this.<br />

o Will the green ro<strong>of</strong> be accessible?<br />

Not to the public.<br />

o Statement: The dining area between building doesn’t seem to promote a<br />

healthy interaction between nature and users.<br />

o The playground looks “cookie cutter” and not custom to the site.<br />

That is true because the playground has not been designed in this<br />

phase <strong>of</strong> conceptual master plans. The current drawings are just a<br />

rendering from a custom playground we built in San Jose.<br />

o Gene Sway, <strong>Emeryville</strong> Architect (Local Architect 3)<br />

o Statement: The architecture is not innovative. Residents are critical <strong>of</strong><br />

existing architecture in <strong>Emeryville</strong> because it’s too bland and modern<br />

looking. His feeling is people want a remarkably distinctive building as a<br />

civic center. The current design looks like Bay Street <strong>Emeryville</strong>.<br />

o<br />

o<br />

o<br />

How are we going to not have this be sterile?<br />

It’s not designed yet, the actual architectural designs will be<br />

completed in the near future.<br />

There has not been enough ‘east’ <strong>Emeryville</strong> proactive participation. How<br />

do we plan to capture real feedback and participation?<br />

The City has been spreading these meetings throughout the City.<br />

A total <strong>of</strong> 8 meetings will be held that include Emery Bay Village,<br />

this presentation at City Hall, and Anna Yates Elementary School.<br />

Two postcards will be or have been mailed out, door hangers were<br />

placed on east <strong>Emeryville</strong> homes, and flyers are being distributed<br />

at local markets/businesses. Also two presentations have been held<br />

recently at the Senior <strong>Center</strong> and a presentation at the MLK Day<br />

(<strong>Emeryville</strong> Yes We Can! Event) had a great east <strong>Emeryville</strong><br />

participation with an estimated 600 people in attendance.<br />

You mentioned the ECCL is going to be a LEED certified project, can we<br />

lessen the footprint <strong>of</strong> this building?<br />

Yes, we will be working on creating a green design that<br />

emphasizes height to lessen the footprint.