CONCEPTUAL DESIGN January 9, 2009<br />

<strong>Emeryville</strong> <strong>Center</strong> <strong>of</strong> <strong>Community</strong> <strong>Life</strong><br />

deep x 18 gage and would be spaced at 16” on center. They would be attached at the original<br />

ro<strong>of</strong> framing level and would then balloon frame above the new ro<strong>of</strong> level to create the new<br />

perimeter parapet.<br />

3. Building No. 2: Arts/Performance/Dining<br />

Building No. 3, the Arts/Performance/Dining building is a two story building structure <strong>of</strong><br />

approximately 32,000-gsf. The ground floor will consist <strong>of</strong> two multipurpose rooms, kitchen and<br />

storage rooms. The second floor will consist <strong>of</strong> pre-function and function spaces along with<br />

outdoor terraces. The building's footprint is approximately 80’ in width by 210’ in length with a<br />

configuration <strong>of</strong> three bays in width by seven bays in length.<br />

The gravity framing for the ro<strong>of</strong> framing will consist <strong>of</strong> 1-1/2” 18 gage metal ro<strong>of</strong> deck over open<br />

web steel joists or W27x84 ro<strong>of</strong> purlins spaced at 7’-6” on center which clear span the<br />

performing arts area. The gravity framing system for the second floor would <strong>of</strong> 3-1/4" light<br />

weight concrete fill over 3" – 18 gage composite metal floor deck over W18 beams at 10'-0" on<br />

center spanning to W24 girders. The exterior girders around the perimeter would be W24’s at<br />

each level. Typical steel columns which are not part <strong>of</strong> the lateral system will be W10x49. For<br />

estimating purposes, 8 psf <strong>of</strong> steel framing may be used to account for ro<strong>of</strong> and floor beams,<br />

girders and columns and perimeter bent plate.<br />

The lateral framing system in the transverse and longitudinal directions will consist <strong>of</strong> either<br />

eccentric braced frames or buckling restrained braced frames. Four bays <strong>of</strong> bracing will be<br />

required in each direction and for estimating purposes, 6 psf <strong>of</strong> steel framing may be used to<br />

account for braces, columns, beams and gusset plate connections.<br />

4. Building No. 3: <strong>Community</strong> Services and 7-12 Neighborhood<br />

Building No. 3, the <strong>Community</strong> Services and 7-12 Neighborhood building is a three story<br />

building structure <strong>of</strong> approximately 62,000-gsf. The ground floor will consist <strong>of</strong> the <strong>Community</strong><br />

Service components such as lounges, game and art rooms, a café, resource center and prekindergarten.<br />

The second and third floors will consist <strong>of</strong> classrooms and lab rooms for the 7-12<br />

Neighborhood components. The building's footprint is approximately 80’ in width by 215’.<br />

The gravity framing system for the second and third floors along with the ro<strong>of</strong> would <strong>of</strong> 3-1/4"<br />

light weight concrete fill over 3" – 18 gage composite metal floor deck over W18 beams at 10'-<br />

0" on center spanning to W24 girders. The exterior girders around the perimeter would be<br />

W24’s at each level. Typical steel columns which are not part <strong>of</strong> the lateral system will be<br />

W10x49. For estimating purposes, 8 psf <strong>of</strong> steel framing may be used to account for ro<strong>of</strong> and<br />

floor beams, girders and columns.<br />

The lateral framing system in the transverse and longitudinal directions will consist <strong>of</strong> either<br />

eccentric braced frames or buckling restrained braced frames. Four bays <strong>of</strong> bracing will be<br />

required in each direction and for estimating purposes, 6 psf <strong>of</strong> steel framing may be used to<br />

account for braces, columns, beams and gusset plate connections.<br />

Outline Specifications- 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!