09.11.2014 Views

Conceptual Master Plan - Emeryville Center of Community Life

Conceptual Master Plan - Emeryville Center of Community Life

Conceptual Master Plan - Emeryville Center of Community Life

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LELAND SAYLOR ASSOCIATES<br />

PROJECT: EMERYVILLE CENTER OF COMMUNITY LIFE LSA JOB NO: 08-121A R5<br />

LOCATION: EMERYVILLE, CA PREPARED BY: MS<br />

CLIENT: FIELD PAOLI CHECKED BY: BS<br />

DESCRIPTION: ARTS AND PERFORMANCE DATE: 2/27/2009<br />

CONCEPT ESTIMATE<br />

NO. BLDGS: ONE (1) STORIES: 2<br />

BASEMENT: NONE PERIM: 655<br />

TYPE CONSTRUCTION: TYPE IV-1HR ROOMS: 12<br />

SPECIAL FDN: NO FOOTPRINT: 13,000<br />

SITE:<br />

TOTAL BLDG SQ.FT: 21,200<br />

ITEM # DESCRIPTION QTY UNIT COST TOTAL<br />

2.13 FOUNDATIONS 3.97 84,131<br />

2.17 SLAB ON GRADE, FILL SLAB, LEVEL 5.03 106,574<br />

3.01 STRUCTURE, VERTICAL COMPONENTS 17.00 360,400<br />

3.02 STRUCTURE, HORIZONTAL COMPONENTS 42.65 904,274<br />

3.03 FIREPROOFING 2.83 60,018<br />

3.06 SHEARWALLS - NONE<br />

4.11 EXT. WALLS/PARAPETS, INSUL. EXT. WALL 45.46 963,734<br />

4.12 FENESTRATION 30.28 641,900<br />

4.13 DOORS - EXTERIOR 3.45 73,147<br />

4.21 ROOF, INSULATION & S.M. REM. & REP. - NONE<br />

4.31 MISC. IRON, S.M., SOUND INSULATION 2.19 46,512<br />

4.32 SKYLIGHTS - NONE<br />

4.36 PAINTING 1.00 21,200<br />

5.11 WALLS, INTERIOR 4.29 90,918<br />

5.12 DOORS - INTERIOR, INCL FRAME, HDWE, PAINT 0.82 17,290<br />

5.21 CEILING FINISHES 5.80 123,055<br />

5.22 FLOOR FINISHES, CARPET & RESILIENT 6.42 136,104<br />

5.31 TILE 5.67 120,299<br />

5.32 OTHER SPECIAL FINISHES 4.01 85,114<br />

5.40 INTERIORS 1.97 41,724<br />

5.41 CABINETS AND TOPS, FURNITURE 8.81 186,798<br />

6.10 GENERAL BUILDING SPECIALTIES 6.69 141,740<br />

7.00 EQUIPMENT 16.51 350,000<br />

8.00 SPECIAL CONSTRUCTION 0.18 3,900<br />

9.00 CONVEYING 12.00 254,460<br />

10.11 PLUMBING 10.00 212,000<br />

10.12 HVAC 28.00 593,600<br />

10.17 FIRE PROTECTION 4.64 98,358<br />

11.00 ELECTRICAL, GENERAL 25.00 530,000<br />

11.02 ELECTRICAL SPECIAL SYSTEMS 13.07 277,139<br />

SUBTOTAL BUILDINGS 307.75 6,524,389

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!