09.11.2014 Views

Conceptual Master Plan - Emeryville Center of Community Life

Conceptual Master Plan - Emeryville Center of Community Life

Conceptual Master Plan - Emeryville Center of Community Life

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LELAND SAYLOR ASSOCIATES<br />

PROJECT: EMERYVILLE CENTER OF COMMUNITY LIFE LSA JOB NO: 08-121A R5<br />

LOCATION: EMERYVILLE, CA PREPARED BY: MS<br />

CLIENT: FIELD PAOLI CHECKED BY: BS<br />

DESCRIPTION: BLDG 7 EXISTING GYM AND POOL DATE: 2/27/2009<br />

CONCEPT ESTIMATE<br />

NO. BLDGS: ONE (1) STORIES: 1<br />

BASEMENT: NONE PERIM: 540<br />

TYPE CONSTRUCTION: TYPE IV-1HR ROOMS: 12<br />

SPECIAL FDN: NO FOOTPRINT: 18,600<br />

SITE:<br />

TOTAL BLDG SQ.FT: 18,600<br />

ITEM # DESCRIPTION QTY UNIT COST TOTAL<br />

2.13 FOUNDATIONS - NONE<br />

2.17 SLAB ON GRADE, FILL SLAB, LEVEL 2.64 49,140<br />

3.01 STRUCTURE, VERTICAL COMPONENTS 10.00 186,000<br />

3.02 STRUCTURE, HORIZONTAL COMPONENTS 10.00 186,000<br />

3.03 FIREPROOFING - NONE<br />

3.06 SHEARWALLS - NONE<br />

4.11 EXT. WALLS/PARAPETS, INSUL. EXT. WALL 5.00 93,000<br />

4.12 FENESTRATION - NONE<br />

4.13 DOORS - EXTERIOR - NONE<br />

4.21 ROOF, INSULATION & S.M. REM. & REP. - NONE<br />

4.31 MISC. IRON, S.M., SOUND INSULATION - NONE<br />

4.32 SKYLIGHTS - NONE<br />

4.36 PAINTING 1.00 18,600<br />

5.11 WALLS, INTERIOR 4.82 89,659<br />

5.12 DOORS - INTERIOR, INCL FRAME, HDWE, PAINT 0.33 6,175<br />

5.21 CEILING FINISHES - NONE<br />

5.22 FLOOR FINISHES, CARPET & RESILIENT 0.65 12,090<br />

5.31 TILE - NONE<br />

5.32 OTHER SPECIAL FINISHES - NONE<br />

5.40 INTERIORS 0.17 3,250<br />

5.41 CABINETS AND TOPS, FURNITURE - NONE<br />

6.10 GENERAL BUILDING SPECIALTIES - NONE<br />

7.00 EQUIPMENT 1.08 20,000<br />

8.00 SPECIAL CONSTRUCTION 6.45 120,000<br />

9.00 CONVEYING - NONE<br />

10.11 PLUMBING 3.18 59,158<br />

10.12 HVAC 28.00 520,800<br />

10.17 FIRE PROTECTION 1.38 25,750<br />

11.00 ELECTRICAL, GENERAL 4.08 75,800<br />

11.02 ELECTRICAL SPECIAL SYSTEMS 4.60 85,623<br />

SUBTOTAL BUILDINGS 83.39 1,551,045

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!