CONCEPTUAL DESIGN January 9, 2009<br />

<strong>Emeryville</strong> <strong>Center</strong> <strong>of</strong> <strong>Community</strong> <strong>Life</strong><br />

Section 12690: Entry Mats<br />

1. Provide recessed door mats inside and outside the main entry doors. Typical size is to<br />

be 4’ x 6’. Material to be segmented aluminum with highly abrasive resistant Nylon<br />

carpet inserts, Pawling Corporation Rol-Dek II - Coral Plus, Style EM-550 or equal.<br />

2. Frame to be extruded aluminum, Pawling Corporation Style MRFM-1002 or equal.<br />

DIVISION 13000<br />

Section 13100: Renovation <strong>of</strong> Existing Swimming Pool<br />

1.1 INTRODUCTION<br />

This report summarizes the swimming pool evaluation for the <strong>Emeryville</strong> <strong>Center</strong> for<br />

<strong>Community</strong> Lift swimming pool and pool equipment. This evaluation is based upon<br />

the conditions we were able to observe during our site tour and information provided<br />

to us by the facility staff. We did not have any as-built plans to consult during this<br />

evaluation. There was no destructive testing during this evaluation. Destructive<br />

testing is outside the scope <strong>of</strong> this evaluation. Hidden defects and structural<br />

conditions beyond what we were able to observe is beyond the scope <strong>of</strong> this report.<br />

1.2 COMPLEX DESCRIPTION<br />

The <strong>Emeryville</strong> <strong>Center</strong> <strong>of</strong> <strong>Community</strong> <strong>Life</strong> swimming pool is located adjacent to the<br />

<strong>Emeryville</strong> High School. The facility is run by the City Parks and Recreation<br />

Department. There currently is no high school use <strong>of</strong> the swimming pool. The<br />

swimming pool is surrounded by buildings on three sides and a chain link fence on<br />

the fourth. The facility consists <strong>of</strong> a single 6-lane swimming pool with concrete<br />

decking around the perimeter <strong>of</strong> the pool. A bathhouse with minimal bathroom<br />

fixtures is adjacent to the pool deck. The facility does not have an <strong>of</strong>fice for ticket<br />

taking, lifeguards, first aid or a facility director. Ticket taking is currently achieved<br />

with a portable folding table and a pop-up tent on the pool deck. There is evidence<br />

that the facility has undergone some renovations since it was originally built. This is<br />

evidenced by the conversion <strong>of</strong> the original pool scum gutters to a skimmer surface<br />

water collection system and the relatively new pool mechanical equipment.<br />

1.3 PROGRAMMING<br />

The City staff reports that the swimming pool is open approximately nine months a year.<br />

The pool opens in March and closes in October. The following aquatic programs<br />

have been identified by the City staff as the current or desired programs that the<br />

swimming pool complex needs to support.<br />

<br />

Swim Lessons<br />

Outline Specifications- 56