PROJECT: EMERYVILLE CENTER OF COMMUNITY LIFE JOB NUMBER: 08-121A R5<br />

LOCATION: EMERYVILLE, CA PREPARED BY: MS<br />

CLIENT: FIELD PAOLI<br />

BID DATE: 1/10/2010<br />

DESCRIPTION: 170,000 SF MIXED- USE COMMUNITY BUILDING<br />

ESTIMATE DATE: 2/27/2009<br />

PREFACE AND NOTES TO THE ESTIMATE<br />

4.0 ESTIMATE DOCUMENTS<br />

4.1<br />

This Estimate has been compiled from the following documents and information supplied:<br />

DRAWINGS:<br />

Architectural Mechanical Landscaping<br />

4 None None<br />

Structural Plumbing Accessibility Standards<br />

INCLUDED None None<br />

Civil Electrical Other<br />

None None None<br />

SPECIFICATIONS / PROJECT MANUAL:<br />

YES<br />

COSTS PROVIDED BY OTHERS:<br />

NONE<br />

4.2<br />

The user is cautioned that significant changes in the scope <strong>of</strong> the project, or alterations to the project<br />

documents after completion <strong>of</strong> the concept estimate can cause major cost changes. In these<br />

circumstances, Leland Saylor Associates should be notified and an appropriate adjustment made to the<br />

concept estimate.