24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. SAFETY SYSTEMS/INTERLOCKS (CONTD.)<br />

S.<br />

No.<br />

12.<br />

(Contd.)<br />

13<br />

14<br />

15<br />

16<br />

Safety<br />

system/<br />

Interlock<br />

Motive power<br />

failure<br />

PLC failure<br />

Product box<br />

jammed<br />

Seismic<br />

detector<br />

Tests Conducted by<br />

Test<br />

conducted<br />

Simulated by<br />

switching off<br />

the main<br />

power supply<br />

Simulated by<br />

switching off<br />

PLC supply<br />

Simulated by<br />

jamming<br />

product boxes<br />

Simulated by<br />

creating<br />

excess<br />

vibrations<br />

Expected response of<br />

control system<br />

3. Source, if exposed should lower and<br />

the conveyor should stop, if ON.<br />

4. Search should get cancelled<br />

5. Search can not be started or<br />

conducted if the emergency persists<br />

6. DM water pump should stop to<br />

prevent circulation of contaminated<br />

water<br />

1. Battery back up supply to PLC<br />

through UPS<br />

2. Source position indicators and<br />

emergency to be displayed<br />

3. Source, if exposed should lower by<br />

gravity and the conveyor should<br />

stop, if ON.<br />

1. Source, if exposed should lower by<br />

gravity and the conveyor should<br />

stop, if ON.<br />

2. Prevents source raising operations<br />

1. Source, if exposed should lower and<br />

the conveyor should stop, if ON.<br />

2. Prevents source raising operations<br />

1. Source, if exposed should lower and<br />

the conveyor should stop, if ON<br />

2. Prevents source raising operations<br />

Tests Approved by<br />

Observed<br />

response<br />

of<br />

control<br />

system<br />

(i) Name Name<br />

Designation<br />

Designation<br />

(ii) Name Name<br />

Designation<br />

Designation<br />

(Facility-In-Charge/RSO/Operator<br />

of Radiation Processing Facility)<br />

101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!