- Page 1 and 2:
GUIDE NO. AERB/RF/SG/G-3 (Vol. 2 of
- Page 3 and 4:
4. Performance of Safety System/Int
- Page 5 and 6:
APPENDIX-3D-I & II (Refer section 3
- Page 7 and 8:
APPENDIX-3D-III (Refer section 3.7.
- Page 9 and 10:
APPENDIX-3E (Refer section 3.2.2.5
- Page 11 and 12:
APPENDIX-3F (Refer sections 3.2.2.3
- Page 13 and 14:
1.6 Non-conformance Control and Cor
- Page 15 and 16:
and that of product specifications.
- Page 17 and 18:
4. Hazard Assessment (a) (b) (c) (d
- Page 19 and 20:
(h) 4. Safety Analysis (a) (b) (c)
- Page 21 and 22:
APPENDIX-4C (Refer section 3.3.4) F
- Page 23 and 24:
APPENDIX-4F (Refer section 3.3.2 to
- Page 25 and 26:
established which includes the arra
- Page 27 and 28:
conditions adverse to quality, such
- Page 29 and 30:
B.3.2 (d) report (ATR), and radiati
- Page 31 and 32:
for review and disposition of non-c
- Page 33 and 34:
Leakage radiation and other paramet
- Page 35 and 36:
- Dose rate profiles anticipated at
- Page 37 and 38:
other action to be taken (e.g. Ozon
- Page 39 and 40: APPENDIX-5D (Refer section 3.4.1.4)
- Page 41 and 42: (c) (d) (e) (f) (g) (h) (i) (j) Fac
- Page 43 and 44: (b) Structural design: Seismic and
- Page 45 and 46: 20. Pre-operational radiation surve
- Page 47 and 48: APPENDIX-5E (Refer section 3.4.1.4)
- Page 49 and 50: APPENDIX-5F (Refer section 3.4.1.3,
- Page 51 and 52: A.3.2 A.3.3 control of documents sh
- Page 53 and 54: A.7. for review and disposition of
- Page 55 and 56: B.3.2 (b) (c) (d) Document release
- Page 57 and 58: for review and disposition of non-c
- Page 59 and 60: (c) (d) (iii) (iv) (v) (vi) (vii) (
- Page 61 and 62: APPENDIX-6B (Refer section 3.4.3.3)
- Page 63 and 64: - Dose rate profiles anticipated at
- Page 65 and 66: - Prevention of accidental fall of
- Page 67 and 68: - Type of detectors used and their
- Page 69 and 70: APPENDIX-6D (Refer section 3.4.3.4)
- Page 71 and 72: - Dose rate profiles anticipated at
- Page 73 and 74: - Prevention of accidental fall of
- Page 75 and 76: - Type of detectors used and their
- Page 77 and 78: Provisions including adequate finan
- Page 79 and 80: Price Order for this guide should b
- Page 81 and 82: such as industrial safety and envir
- Page 83 and 84: Betatron An electron accelerator in
- Page 85 and 86: Manufacture, possess, store, use, t
- Page 87 and 88: adioactive substances and has an ac
- Page 89: Treatment Simulation Methods by whi
- Page 93 and 94: 3.3.8 Lead Time for Submission/Avai
- Page 95 and 96: 3.8.3 Construction ................
- Page 97 and 98: 3.15.2 Procurement and Registration
- Page 99 and 100: FUNCTIONAL PERFORMANCE OF SAFETY SY
- Page 101 and 102: APPENDIX-5E (Refer section 3.4.1.4)
- Page 103 and 104: GAMMA RADIATION PROCESSING FACILITY
- Page 105 and 106: FACILITY FOR RADIATION TECHNOLOGY (
- Page 107 and 108: ANNEXURE-33b APPLICATION FOR PROCUR
- Page 109 and 110: BIOMEDICAL RESEARCH STUDIES ON HUMA
- Page 111 and 112: ANNEXURE-59 APPLICATION FOR NO (3.1
- Page 113 and 114: VOLUME - 2
- Page 115 and 116: tools should conform to the relevan
- Page 117 and 118: (c) (d) (ii) (iii) (iv) (v) (vi) (v
- Page 119 and 120: APPENDIX-2B (Refer section 3.2.1.3)
- Page 121 and 122: - Overhead water storage tank detai
- Page 123 and 124: - Ozone concentration (maximum) ant
- Page 125 and 126: APPPENDIX-2C (Refer section 3.2.1.4
- Page 127 and 128: 1. SAFETY SYSTEMS/INTERLOCKS (CONTD
- Page 129 and 130: 2. AREA/ZONE MONITORS S. No. 1. 2.
- Page 131 and 132: 3. EMERGENCY WATER LEVEL SENSOR (CO
- Page 133 and 134: 5 (i) SEARCH OPERATION - 1 (Hydraul
- Page 135 and 136: S. No. 1. 2. 3. 4. 5. 6. Audio / Co
- Page 137 and 138: the design, statement declaring com
- Page 139 and 140: - Gravity/accidental fall of rack i
- Page 141 and 142:
5. Design Basis Accident Analysis A
- Page 143 and 144:
h. Quantity of activity : —— PB
- Page 145 and 146:
APPENDIX-2E (Refer section 3.2.1.4)
- Page 147 and 148:
F. EMERGENCY PLANNING AND PROCEDURE
- Page 149 and 150:
(g) (h) 1.2 Organisation The need t
- Page 151 and 152:
(i) (ii) (iii) 1.3 Interfaces Ensur
- Page 153 and 154:
(iii) (iv) (v) (vi) All constructio
- Page 155 and 156:
Standards to which the accelerator
- Page 157 and 158:
(b) Accelerator facility (c ) Elect
- Page 159 and 160:
15. Details of Disposal Procedures
- Page 161 and 162:
Details of beam energy and current
- Page 163 and 164:
(h) Laboratory, workshops, stores e
- Page 165 and 166:
(i) (ii) (iii) (iv) (v) (vi) During
- Page 167 and 168:
4. Documentation Detail Design Deta
- Page 169 and 170:
8. Normal and Emergency Operation P
- Page 171 and 172:
4. Performance of Safety System/Int
- Page 173 and 174:
APPENDIX-3D-I & II (Refer section 3
- Page 175 and 176:
APPENDIX-3D-III (Refer section 3.7.
- Page 177 and 178:
APPENDIX-3E (Refer section 3.2.2.5
- Page 179 and 180:
APPENDIX-3F (Refer sections 3.2.2.3
- Page 181 and 182:
1.6 Non-conformance Control and Cor
- Page 183 and 184:
and that of product specifications.
- Page 185 and 186:
4. Hazard Assessment (a) (b) (c) (d
- Page 187 and 188:
(h) 4. Safety Analysis (a) (b) (c)
- Page 189 and 190:
APPENDIX-4C (Refer section 3.3.4) F
- Page 191 and 192:
APPENDIX-4F (Refer section 3.3.2 to
- Page 193 and 194:
established which includes the arra
- Page 195 and 196:
conditions adverse to quality, such
- Page 197 and 198:
B.3.2 (d) report (ATR), and radiati
- Page 199 and 200:
for review and disposition of non-c
- Page 201 and 202:
Leakage radiation and other paramet
- Page 203 and 204:
- Dose rate profiles anticipated at
- Page 205 and 206:
other action to be taken (e.g. Ozon
- Page 207 and 208:
APPENDIX-5D (Refer section 3.4.1.4)
- Page 209 and 210:
(c) (d) (e) (f) (g) (h) (i) (j) Fac
- Page 211 and 212:
(b) Structural design: Seismic and
- Page 213 and 214:
20. Pre-operational radiation surve
- Page 215 and 216:
APPENDIX-5E (Refer section 3.4.1.4)
- Page 217 and 218:
APPENDIX-5F (Refer section 3.4.1.3,
- Page 219 and 220:
A.3.2 A.3.3 control of documents sh
- Page 221 and 222:
A.7. for review and disposition of
- Page 223 and 224:
B.3.2 (b) (c) (d) Document release
- Page 225 and 226:
for review and disposition of non-c
- Page 227 and 228:
(c) (d) (iii) (iv) (v) (vi) (vii) (
- Page 229 and 230:
APPENDIX-6B (Refer section 3.4.3.3)
- Page 231 and 232:
- Dose rate profiles anticipated at
- Page 233 and 234:
- Prevention of accidental fall of
- Page 235 and 236:
- Type of detectors used and their
- Page 237 and 238:
APPENDIX-6D (Refer section 3.4.3.4)
- Page 239 and 240:
- Dose rate profiles anticipated at
- Page 241 and 242:
- Prevention of accidental fall of
- Page 243 and 244:
- Type of detectors used and their
- Page 245 and 246:
Provisions including adequate finan
- Page 247 and 248:
(b) Contamination monitoring - On l
- Page 249 and 250:
1.3 Organisation The responsible or
- Page 251 and 252:
(ii) (iii) 1.4 Interfaces Ensuring
- Page 253 and 254:
1.6 Accident statistics should be m
- Page 255 and 256:
adiation zone monitors and radiatio
- Page 257 and 258:
(APPENDIX 8C-I, 8C-II, 8C-III AND 8
- Page 259 and 260:
2. Pre-patient/post-patient collima
- Page 261 and 262:
APPENDIX-8C-I (Refer section 3.6.3)
- Page 263 and 264:
C.3 Measurement of Timer Linearity
- Page 265 and 266:
Tolerance : ± 20% of the quoted va
- Page 267 and 268:
(a) Shift in the edges of the radia
- Page 269 and 270:
6. LINEARITY OF TIMER Operating par
- Page 271 and 272:
(c) (d) Recommended performance sta
- Page 273 and 274:
TABLE 3 : HVT AS A FUNCTION OF FILT
- Page 275 and 276:
2.5 Locking facility of the compres
- Page 277 and 278:
6. ACCELERATING VOLTAGE Result : Se
- Page 279 and 280:
Result : Coefficient of linearity f
- Page 281 and 282:
APPENDIX-8E (Refer section 3.6.3 )
- Page 283 and 284:
(THIS IS THE ONLY APPENDIX FOR INDU
- Page 285 and 286:
APPENDIX-10 (Refer section 3.18.1)
- Page 287 and 288:
APPENDIX-10 (CONTD.) (Refer section
- Page 289 and 290:
Containing Radioactive Substances
- Page 291 and 292:
LIST OF PARTICIPANTS DRAFT DOCUMENT
- Page 293 and 294:
ADVISORY COMMITTEE ON PREPARATION O
- Page 295 and 296:
PROVISIONAL LIST OF CODES, GUIDES A