24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- Shield material, density, and quality control<br />

measures followed during shield construction<br />

- Maximum and minimum shield thickness, roof<br />

thickness<br />

- Drawings and layout of the device location<br />

installed<br />

- Dose rate profiles anticipated at various locations:<br />

(Maximum and minimum values). Indicate them<br />

on a sketch of the facility - control room, roof,<br />

access doors, openings and where personnel are<br />

expected to be stationed for work or otherwise.<br />

- Radiation shielding evaluation including sky shine<br />

- Maximum dose rate anticipated<br />

Locations : (indicate also in a sketch)<br />

11. Documentation Details of Auxiliary Services<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

Electrical power and power supply systems (including emergency<br />

power supply), major electrical equipment, illumination, lift, hoist,<br />

cranes etc.<br />

Air conditioning and ventilation system (including treatment of<br />

noxious gases produced, if any)<br />

Cooling water supply system<br />

Compressed air system<br />

Communication system<br />

Target gas handling system - system description, characteristics of<br />

the gas (properties, specifications, purification etc.)<br />

Laboratory, workshops, stores, etc.<br />

Other services (please specify)<br />

Controls of various subsystems, description, operation etc.<br />

12. List of Potential Hazards and Safety Measures to be Taken<br />

(a)<br />

(b)<br />

(c)<br />

During precommissioning trials of all systems and subsystems<br />

During commissioning<br />

During operation and maintenance<br />

13. Safety Features Including Hazard Evaluation<br />

(a)<br />

Design safety of buildings and equipment<br />

183

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!