24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX-4C<br />

(Refer section 3.3.4)<br />

FORMAT FOR THE ACCEPTANCE TEST REPORT (ATR) FOR<br />

PARTICLE ACCELERATOR RESEARCH FACILITIES<br />

(PARF >10MeV)<br />

S.<br />

No.<br />

Safety system<br />

Observations/<br />

Remarks<br />

Signature with<br />

name and<br />

designation for<br />

accepting the<br />

performance<br />

1.<br />

Door Interlock<br />

- Power cutoff after opening<br />

- Signal in control room<br />

- Manual resetting<br />

2.<br />

Scram Switches<br />

- Power cut-off after pressing the scram<br />

switch<br />

- Signal in control room<br />

- Manual resetting<br />

3.<br />

Area Radiation Monitors Interlock<br />

- Power cut-off after radiation field<br />

increases more than specified<br />

- Signal in the control room<br />

- Local sound alarm<br />

- Calibration of monitors<br />

4.<br />

Vacuum Failure<br />

- Identification of loss of vacuum<br />

- Functioning of gate valve<br />

- Response time<br />

5.<br />

LCW Cooling System<br />

- Functioning of sensor for temperature,<br />

flow etc.<br />

- Indication in the control room<br />

- Tripping of plant system<br />

162

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!