24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

20. Pre-operational radiation survey report (background radiation in and vicinity<br />

of the medical cyclotron facility)<br />

21. Quality assurance manual for construction of the facility (as per format given<br />

in item A of Appendix 6A of AERB/RF/SG/G-3)<br />

22. Details of waste disposal pocedures and provisions including adequate<br />

financial arrangement for safe disposal of spent/ disused sources.<br />

23. Details of storage facility for activated components and procedure (identifying<br />

long half life radioisotopes)<br />

24. Details to be furnished regarding the decommissioning of the facility.<br />

B. OPERATING AND SAFETY PERSONNEL<br />

(i) Cyclotron operator :<br />

(ii) Radiopharmacist :<br />

(iii) Radiological safety officer :<br />

AERB Approval Ref. :<br />

Date of issue :<br />

Valid up to :<br />

DETAILS OF DOCUMENTS TO BE SUBMITTED<br />

Required documents<br />

Technical description of medical cyclotron design and working procedure with<br />

drawings<br />

Electrical circuit diagram and other interlocks of the medical cyclotron device<br />

(inbuilt safety features)<br />

Electrical circuit diagram and other interlocks of the medical cyclotron vault<br />

Calibration and periodic checks<br />

Provisions and procedures for (particle beam energy, beam current)<br />

Quality assurance manual (operation)<br />

Arrangements for personal and environmental monitoring system<br />

Periodic surveys of radioactive contamination if applicable<br />

Availability of local safety committee and their safety evaluation report<br />

Details of deviations from approved medical cyclotron components, medical<br />

cyclotron vault, shielding design, etc.<br />

Decommissioning procedures of the medical cyclotron facility<br />

186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!