24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX-4C<br />

(Refer section 3.3.4)<br />

FORMAT FOR THE ACCEPTANCE TEST REPORT (ATR) FOR<br />

PARTICLE ACCELERATOR RESEARCH FACILITIES<br />

(PARF >10MeV)<br />

S.<br />

No.<br />

Safety system<br />

Observations/<br />

Remarks<br />

Signature with<br />

name and<br />

designation for<br />

accepting the<br />

performance<br />

1.<br />

Door Interlock<br />

- Power cutoff after opening<br />

- Signal in control room<br />

- Manual resetting<br />

2.<br />

Scram Switches<br />

- Power cut-off after pressing the scram<br />

switch<br />

- Signal in control room<br />

- Manual resetting<br />

3.<br />

Area Radiation Monitors Interlock<br />

- Power cut-off after radiation field<br />

increases more than specified<br />

- Signal in the control room<br />

- Local sound alarm<br />

- Calibration of monitors<br />

4.<br />

Vacuum Failure<br />

- Identification of loss of vacuum<br />

- Functioning of gate valve<br />

- Response time<br />

5.<br />

LCW Cooling System<br />

- Functioning of sensor for temperature,<br />

flow etc.<br />

- Indication in the control room<br />

- Tripping of plant system<br />

162

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!