24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Trained and authorised operator should be available for operation of PARF.<br />

Measures should be established to<br />

(i)<br />

(ii)<br />

identify emergency situations and to develop and implement<br />

procedures for coping with emergencies; and<br />

to hold emergency exercises at specified intervals to identify<br />

inadequacies, if any.<br />

B.4 VERIFICATION FUNCTIONS<br />

B.4.1<br />

B.4.2<br />

B.4.3<br />

Verification Programme<br />

A comprehensive documented verification programme should be prepared<br />

and verification conducted accordingly to assure conformance of<br />

commissioning and operation of the PARF as per the relevant specified codes<br />

and procedures. Verification programme should comprise external as well as<br />

internal verification<br />

Inspection and Test Controls<br />

Measures should be established to ensure that testing and measuring devices<br />

used in determining conformance to acceptance criteria are of proper range,<br />

type, accuracy and precision.<br />

Testing and measuring devices should be controlled, calibrated and adjusted<br />

at specified intervals, or before use, to maintain accuracy within necessary<br />

limits.<br />

Controls shall be established to ensure proper handling, storage and use of<br />

calibrated instruments.<br />

Audit<br />

Provisions need to be prescribed detailing the establishment and<br />

implementation of a comprehensive system of planned and documented audits<br />

to verify the implementation and effectiveness of the various elements of the<br />

quality assurance programme. It should address the audit performance, audit<br />

personnel, audit plan and audit timing etc. The requirement for QA audit and<br />

extent of its application should be based on the safety significance of the<br />

system.<br />

B. 5 CORRECTIVE FUNCTIONS<br />

B.5.1<br />

Non-conformity Control and Corrective Actions<br />

A system for the control of non-conformances and their corrective actions<br />

should be established. Non-conformances, deviations or inadequacies<br />

affecting quality should be identified and controlled. The persons responsible<br />

171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!