24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

(k)<br />

(l)<br />

(m)<br />

(n)<br />

(o)<br />

(p)<br />

Slug(s) is missing or rolled from the hot cell table<br />

Heavy contamination of hot cell, contamination of pool water pool<br />

High activity of gaseous waste discharge in air<br />

Failure of access door interlocks<br />

Fire in the IFRT<br />

Failure of ventilation system<br />

Failure of power supply<br />

Failure of PLC<br />

Earthquake at the IFRT site<br />

Flooding of hot cell with water<br />

Leakage of water from pool<br />

Breakage of pool lining<br />

Fall of person in the water pool<br />

The designer/manufacturer shall carry out such analysis to demonstrate means<br />

provided to prevent and handle above situations safely.<br />

14. Decommissioning of IFRT:<br />

- Procedure to be followed when decision is<br />

made to close down the facility permanently.<br />

- Provisions including adequate financial<br />

arrangement for safe disposal of spent/disused<br />

sources.<br />

209

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!