established which includes the arrangements and responsibilities for the<br />

categorisation, receipt, indexing, storage, retrieval and disposal of construction<br />

records. Document control system should also include records of as-built<br />

condition of structures, systems and components.<br />

A. 3.2 Procurement Control<br />

A.3.3<br />

Measures shall be established and documented to ensure that relevant<br />

standards/specifications and other requirements necessary to assure adequate<br />

quality are included or referenced for procurement of items and services<br />

required during construction of PARF.<br />

Procurement requirements for assuring quality shall be covered by a<br />

procurement document. The document shall include items such as scope of<br />

work, technical requirements, and test, inspection and acceptance<br />

requirements.<br />

Procedures for the preparation, review, approval, issue, modification and<br />

control of documents pertaining to activities affecting construction should<br />

be established. Document release and distribution system shall be established<br />

utilising up-to-date distribution lists. Individuals responsible for issue of<br />

documents shall be identified.<br />

Supplier Evaluation and Selection<br />

Supplier evaluation shall be carried out to assess the capability to provide<br />

items and services in accordance with the requirements of procurement<br />

document(s). The supplier evaluation includes as appropriate:<br />

(a)<br />

(b)<br />

(c)<br />

A.4 PROCESS CONTROL<br />

evaluation of current technical capability, availability of expertise<br />

and resources,<br />

analysis of product samples, and<br />

review of historical quality performance data.<br />

Documented procedures should be established for all construction related<br />

activities of the PARF such as receiving and storing components, civil<br />

construction, equipment erection, cleaning/flushing, inspection, testing,<br />

modification etc. Provision should be made for verification, review and audit<br />

of activities affecting quality of construction.<br />

Site construction activities should be planned and documented in adequate<br />

detail and approved by designated persons/agencies. The plan shall define:<br />

(a)<br />

(b)<br />

The planned sequential order and duration of activities<br />

The resource allocation for each activity<br />

166