24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

(k)<br />

(l)<br />

(m)<br />

(n)<br />

(o)<br />

(p)<br />

Slug(s) is missing or rolled from the hot cell table<br />

Heavy contamination of hot cell, contamination of pool water pool<br />

High activity of gaseous waste discharge in air<br />

Failure of access door interlocks<br />

Fire in the IFRT<br />

Failure of ventilation system<br />

Failure of power supply<br />

Failure of PLC<br />

Earthquake at the IFRT site<br />

Flooding of hot cell with water<br />

Leakage of water from pool<br />

Breakage of pool lining<br />

Fall of person in the water pool<br />

The designer/manufacturer shall carry out such analysis to demonstrate means<br />

provided to prevent and handle above situations safely.<br />

14. Decommissioning of IFRT:<br />

- Procedure to be followed when decision is<br />

made to close down the facility permanently.<br />

- Provisions including adequate financial<br />

arrangement for safe disposal of spent/disused<br />

sources.<br />

209

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!