24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5 (i) SEARCH OPERATION - 1<br />

(Hydraulic pump is ON and search not performed)<br />

S.<br />

No.<br />

Description/<br />

Interlock<br />

Test<br />

conducted<br />

Expected response of<br />

control system<br />

Observed<br />

response<br />

of<br />

control<br />

system<br />

1.<br />

Source raise<br />

PB (Mode of<br />

box transferauto)<br />

Pressed<br />

Source should not come up<br />

2.<br />

Source raise<br />

PB (Mode of<br />

box transfermanual)<br />

Pressed<br />

Source should not come up<br />

Tests Conducted by<br />

Tests Approved by<br />

(i) Name Name<br />

Designation<br />

Designation<br />

(ii) Name Name<br />

Designation<br />

Designation<br />

(Facility-In-Charge/RSO/Operator<br />

of Radiation Processing Facility)<br />

5 (ii) SEARCH OPERATION - 2<br />

(Improper Search Sequence)<br />

S.<br />

No.<br />

Interlock<br />

Test<br />

conducted<br />

Expected response of<br />

control system<br />

Observed<br />

response<br />

of<br />

control<br />

system<br />

1.<br />

Search start<br />

Push Button<br />

(PB)<br />

Pressed<br />

1. Search start lamp to glow<br />

2. Search alarm should sound<br />

3. Message should be displayed on the<br />

monitor and a hard copy to be<br />

obtained<br />

106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!