‘Crash’ or ‘Scram’ buttons either mounted on walls or at doors and<br />
gates<br />
Search and rescue control<br />
Warning indicators (status lights, alarms, posted procedures)<br />
7. Details of Documents with Details (to be submitted)<br />
Design detail : Summary of medical cyclotron design and general<br />
working principles, specifications and physical<br />
parameters of the system and user objectives.<br />
Site characteristics :<br />
Location, occupancy in site area as well as<br />
surrounding population up to 30 meters radius,<br />
geology, load bearing capacity of soil and rock,<br />
structural design criteria, foundation, meteorology,<br />
seismology, water table, flood level, plinth level<br />
(with respect to nearest accessible road), AERB<br />
site approval reference, etc.<br />
Medical cyclotron : Description of general layout, details of buildings,<br />
pressure vessels, vacuum system, radio frequency<br />
system, magnetic field, beam injection, acceleration,<br />
transport and target system including their<br />
design, construction and testing and quality<br />
assurance manual for the equipment.<br />
Synthesis and<br />
dispensing units<br />
: Name and address of the Manufacturer and<br />
supplier, make and model of the synthesis and<br />
dispensing unit, maximum activity to be handled,<br />
material and thickness of shielding.<br />
Biological shield - Final sketch giving details of shielding wall<br />
surrounding the source, wall thickness, labyrinth<br />
access, openings, voids, reinforcements,<br />
embedment etc. in the biological shield. Method<br />
of shielding calculation and the dose limits<br />
followed<br />
- Shield material, density, and quality control<br />
measures followed during shield construction<br />
- Maximum and minimum shield thickness, roof<br />
thickness<br />
- Drawings and layout of the device location<br />
installed<br />