24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Provision shall exist for regular verification of operation activities related to<br />

safety. Preventive and maintenance schedule should be prepared for all safety<br />

systems as per the applicable codes.<br />

Inspection and testing/surveillance during operation of safety equipment as<br />

well as subsequent to maintenance, modification or procedural changes should<br />

be performed to specified requirements and documented.<br />

B.4 VERIFICATION FUNCTIONS<br />

B.4.1<br />

B.4.2<br />

B.4.3<br />

Verification Programme<br />

A comprehensive documented verification programme should be prepared<br />

and verification conducted accordingly to assure conformance of<br />

commissioning and operation of the medical cyclotron facilites as per the<br />

relevant specified codes and procedures. Verification programme should<br />

comprise external as well as internal verification<br />

Inspection and Test Controls<br />

Measures should be established to ensure that testing and measuring devices<br />

(e.g. radiation survey meters, area monitors, tools, gauges and other devices)<br />

used in determining conformance to acceptance criteria are of proper range,<br />

type, accuracy and precision.<br />

Testing and measuring devices should be controlled, calibrated and adjusted<br />

at specified intervals, or before use, to maintain accuracy within necessary<br />

limits.<br />

Controls shall be established to ensure proper handling, storage and use of<br />

calibrated instruments.<br />

Audit<br />

Provisions need to be prescribed detailing the establishment and<br />

implementation of a comprehensive system of planned and documented audits<br />

to verify the implementation and effectiveness of the various elements of the<br />

quality assurance programme. It should address the audit performance, audit<br />

personnel, audit plan and audit timing etc. The requirement for QA audit and<br />

extent of its application should be based on the safety significance of the<br />

system.<br />

B.5 CORRECTIVE FUNCTIONS<br />

B.5.1<br />

Non-conformity Control and Corrective Actions<br />

A system for the control of non-conformances and their corrective actions<br />

should be established. Non-conformances, deviations or inadequacies<br />

affecting quality should be identified and controlled. The persons responsible<br />

197

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!