24.11.2014 Views

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

Volume 2 - Atomic Energy Regulatory Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX-4C (CONTD.)<br />

(Refer section 3.3.4)<br />

FORMAT FOR THE ACCEPTANCE TEST REPORT (ATR) FOR<br />

PARTICLE ACCELERATOR RESEARCH FACILITIES<br />

(PARF >10MeV)<br />

S.<br />

No.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

Safety system<br />

Public Address System (PAS)<br />

- Functioning of mike<br />

- Functioning of speakers at all locations<br />

Fire Detection System<br />

- Power supply to fire detection system<br />

- Detection of fire<br />

- Alarm local and in control room<br />

- Resetting of alarm<br />

Beam Shutter Response<br />

- Functioning<br />

- Response time<br />

Beam Loss Monitor<br />

- Functioning of interlock with bending<br />

magnet<br />

- Signal in control room<br />

Other safety systems<br />

[Add as applicable]<br />

Observations/<br />

Remarks<br />

Signature with<br />

name and<br />

designation for<br />

accepting the<br />

performance<br />

163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!