Bangladesh Country Investment Plan - Feed the Future
Bangladesh Country Investment Plan - Feed the Future
Bangladesh Country Investment Plan - Feed the Future
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
GOB Project Title Project Cost (lakh TK) Fund Required between 2010-15 (lakh TK) total M total M total M<br />
Agency<br />
USD USD USD<br />
Total GoB PA Total GoB PA DP Total GOB PA<br />
BADC Pilot Project for Agricultural Production In 2,212 2,212 - 2,212 2,212 - 3.18 3.18 -<br />
Monga Prone Area Through Modern Minor<br />
Irrigation Practices (BADC part)<br />
DAE Increasing Water Use Efficiency 20,000 6,600 13,400 20,000 6,600 13,400 28.78 9.50<br />
BARD Application of Renewable Solar Energy in 442 442 - 442 442 - 0.64 0.64 -<br />
Shallow Tube Well (STW) Irrigation<br />
Management<br />
196,704 120,754 75,950 148,455 102,005 46,450 213.60 146.77 47.55<br />
Sub Prgramme 2.2 : Improve & increase efficiency of surface water irrigation, in particular in <strong>the</strong> south<br />
BADC Coservation and Utilization of Surface water in<br />
Sou<strong>the</strong>rn Region<br />
139,000 13,900 125,100 50,000 3,000 47,000 ADB, IFAD 71.94 4.32 67.63<br />
BADC Surface water lifting from rivers through line 173,750 17,375 156,375 55,000 5,000 50,000 ADB, IFAD 79.14 7.19 71.94<br />
canals for expansion of irrigation facility in <strong>the</strong><br />
sou<strong>the</strong>rn part<br />
BADC Enhancing use of solar pump 34,750 3,475 31,275 34,750 3,475 31,275 ADB, IFAD 50.00 5.00 45.00<br />
BADC Surface / Sub-surface water management in<br />
Haor / Char areas<br />
139,000 13,900 125,100 17,000 1,700 15,300 ADB, IFAD 24.46 2.45 22.01<br />
BADC Innovative Use of Surface Water Project (2nd<br />
Phase)<br />
BADC Greater Mymensingh-Tangail Agricultural<br />
Development Project-2nd Phase<br />
BADC Innovative Use of Surface Water Project (2 nd<br />
Phase)<br />
BADC Greater Dhaka Irrigation Area Development<br />
Project-2 nd Phase<br />
BADC Construction of Rubber Dams in Small &<br />
Medium River for Increasing Food Production<br />
(BADC)<br />
BBMDA Barind Rain Water Conservation and Irrigation<br />
Project (Phase II)<br />
BBMDA Irrigation Programme Through Surface Water<br />
Augmentation<br />
BWDB Re-excavation of connecting rivers,<br />
Development of irrigation facilities and Fish<br />
culture project of Gazner Beel area and<br />
11,653 11,653 - 11,653 11,653 - 16.77 16.77 -<br />
11,653 11,653 - 11,653 11,653 - 16.77 16.77 -<br />
2,318 2,318 - 2,318 2,318 - 3.34 3.34 -<br />
9,931 9,931 - 9,931 9,931 - 14.29 14.29 -<br />
2,429 2,429 - 2,429 2,429 - 3.49 3.49 -<br />
26,198 26,198 - 13,000 13,000 - 18.71 18.71 -<br />
8,740 8,740 - 4,000 4,000 - 5.76 5.76 -<br />
36,171 36,171 - 15,000 15,000 - 21.58 21.58 -<br />
Updated <strong>Bangladesh</strong> <strong>Country</strong> <strong>Investment</strong> <strong>Plan</strong>: A Road Map Towards investing in Agriculture, Food Security and Nutrition<br />
2 June 2011<br />
137