Bangladesh Country Investment Plan - Feed the Future
Bangladesh Country Investment Plan - Feed the Future
Bangladesh Country Investment Plan - Feed the Future
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
GOB<br />
Agency<br />
Project Title Project Cost (lakh TK) Fund Required between 2010-15 (lakh TK) total M total M total<br />
USD USD USD<br />
Total GoB PA Total GoB PA DP Total GOB PA<br />
Sujanagar Upazilla in Pabna District<br />
M<br />
BWDB<br />
BWDB<br />
Tarail Pachuria Flood control, Drainage and<br />
Irrigation Project<br />
Chandpur-Comilla Integrated Flood Control,<br />
Drainage and Irrigation Project<br />
28,145 28,145 - 14,000 14,000 - 20.14 20.14 -<br />
12,772 12,772 - 7,000 7,000 - 10.07 10.07 -<br />
BWDB Rehabilitation of Barisal Irrigation Project 5,925 5,925 - 5,925 5,925 - 8.52 8.52 -<br />
BWDB North Rajshahi Irrigation Project 110,054 110,054 - 55,000 55,000 - 79.14 79.14 -<br />
BWDB Rehabilitation of irrigation schemes 4,000 4,000 - 4,000 4,000 - 5.76 5.76 -<br />
756,489 318,639 437,850 312,659 169,084 143,575 - 449.87 243.29 206.58<br />
Sub Programme 2.3 : Reduce impact of saline water intrusion in <strong>the</strong> South<br />
BWDB Rehabilitation of Coastal Infrastructures 31,538 31,538 - 31,538 31,538 - 45.38 45.38 -<br />
damaged by Alia (South Western Zone)<br />
BWDB Rehabilitation of Coastal Infrastructures<br />
damaged by Alia (Sou<strong>the</strong>rn Zone)<br />
15,461 15,461 - 15,461 15,461 - 22.25 22.25 -<br />
15,461 15,461 - 46,999 46,999 - - 67.63 67.63 -<br />
Sub Programme 2.4 : Enhance river water flow to <strong>the</strong> South<br />
BWDB Buriganga River Restoration Project 94,409 94,409 - 40,000 40,000 - 57.55 57.55 -<br />
BWDB Capital Dredging Of River Systems in <strong>Bangladesh</strong> 102,812 102,812 - 45,000 45,000 - 64.75 64.75 -<br />
BWDB Feasibility Study and Detail Design of Ganges 3,435 3,435 - 3,435 3,435 - 4.94 4.94 -<br />
Barrage project<br />
200,656 200,656 - 88,435 88,435 - - 127.24 127.24 -<br />
Funds required (GAP) for <strong>the</strong> period 2010-2015<br />
Total GOB PA<br />
SUB TOTAL PROGRAMME 2 596,548 406,523 190,025 858.34 584.93 254.14<br />
Programme 3: Improved quality of input and soil fertility<br />
Sub Programme 3.1 : Enhance availability of agricultural inputs, tested and certified for quality of diversified crops<br />
BADC Enhancing Quality Seed Supply BADC) 29,518 5,719 23,799 29,518 5,719 23,799 IDA 42.47 8.23 34.24<br />
BADC Establishment of Seed Multiplication Farm in<br />
<strong>the</strong> South-Western Coastal Region Project<br />
25,360 25,360 - 25,360 25,360 - 36.49 36.49 -<br />
BADC Improvement of Fertilizer Distribution<br />
Management Network<br />
16,300 16,300 - 16,300 16,300 - 23.45 23.45 -<br />
Updated <strong>Bangladesh</strong> <strong>Country</strong> <strong>Investment</strong> <strong>Plan</strong>: A Road Map Towards investing in Agriculture, Food Security and Nutrition<br />
2 June 2011<br />
138