In case of imported equipment and devices, AERB may grant No Objection<br />
Certificate based on an Application submitted along with technical details<br />
and Certificate issued by the competent authority of the country of origin.<br />
The NOC is only <strong>for</strong> the import of the equipment. After import and installation<br />
of the equipment/device, the AERB may carry out verification of per<strong>for</strong>mance<br />
test of the unit. The AERB may grant Type Approval based on the verification<br />
of per<strong>for</strong>mance and on being satisfied that the equipment/device meets the<br />
requirements of National/ International standards specified in the technical<br />
in<strong>for</strong>mation provided to AERB.<br />
4.11.1.2 Assessment <strong>Process</strong><br />
For consideration of Approvals <strong>for</strong> equipment, devices, sources and shipments<br />
listed in subsection 2.8.1, the applicant is required to furnish generally the<br />
following:<br />
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
safety analysis report, as applicable;<br />
compensatory safety measures to be achieved through operational<br />
controls (applicable <strong>for</strong> shipment approval only);<br />
quality assurance (QA) programme;<br />
test report meeting the relevant specifications in accordance with<br />
Standards approved by AERB or details of National/International<br />
Standards followed along with the certificate issued by the AERB of<br />
the country of origin (where applicable).<br />
The AERB against an application complete in all respects grants Approval<br />
after review. The Type Approval is, unless otherwise specified, valid <strong>for</strong> a<br />
period of five years and may be renewed subsequently based on its continued<br />
compliance wherever applicable.<br />
The Consentee is required to submit to AERB periodic reports on the quality<br />
control and quality assurance measures being followed in the manufacture of<br />
the approved equipment/devices, transport packages or encapsulation of<br />
sealed sources.<br />
4.11.2 Safety Manpower Approval (i.e.RSO Approval)<br />
4.11.2.1 Review <strong>Process</strong><br />
A two-tier review process is followed by the AERB be<strong>for</strong>e issuance of<br />
approval of <strong>Radiation</strong> Safety Officer (Level I, II & III) designated <strong>for</strong> a<br />
radiation facility. Two-tier review includes review by AERB <strong>for</strong> checking<br />
the essential qualifications, training and experience, meeting the requirement,<br />
followed by review in the safety review committee <strong>for</strong> application of radiation<br />
(SARCAR).<br />
85