explained in section 3, <strong>for</strong> issuing Consent in the <strong>for</strong>m of a Registration <strong>for</strong><br />
radiation facility as defined in subsection 2.7.1(i-v) are illustrated in Table<br />
given in subsection 2.7.2.<br />
2.7.2 Consents, Review <strong>Process</strong> and Lead Time at Various Stages<br />
Consents, review process and lead time required at various stages of<br />
consenting process <strong>for</strong> radiation facilities defined in subsection 2.7.1(i-v).<br />
<strong>Radiation</strong><br />
facility as<br />
defined in sec.<br />
2.7.1(i-v)<br />
(i) Medical<br />
diagnostic<br />
X-ray equipment<br />
including<br />
therapy<br />
simulator;<br />
(ii) Nucleonic<br />
gauges<br />
(iii) Radioimmuno-assay<br />
(RIA)<br />
laboratories;<br />
(iv) Radioactive<br />
sources<br />
in tracer<br />
studies;<br />
(v) Biomedical<br />
research using<br />
radioactive<br />
material;<br />
Consent<br />
<strong>for</strong><br />
siting/<br />
(a)<br />
---<br />
Not<br />
required<br />
---<br />
---<br />
---<br />
Consent <strong>for</strong><br />
construction<br />
/layout<br />
plan<br />
approval<br />
(b)<br />
Combined<br />
Consent (a)<br />
and (b)<br />
Not required<br />
Required<br />
Combined<br />
consent (a)<br />
and (b)<br />
Required<br />
Combined<br />
consent (a)<br />
and (b)<br />
Required 2<br />
Combined<br />
consent (a)<br />
and (b)<br />
Consent<br />
<strong>for</strong><br />
commissioning<br />
(c)<br />
---<br />
---<br />
---<br />
---<br />
---<br />
Consent <strong>for</strong><br />
operation<br />
(registration)<br />
(d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Combined<br />
Consent<br />
(c) and (d)<br />
Combined 1<br />
Consent<br />
(c) and (d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Consent<br />
<strong>for</strong><br />
decommissioning/<br />
disposal<br />
(e)<br />
Not<br />
required<br />
Required<br />
Not<br />
required<br />
Not<br />
required<br />
Not<br />
required<br />
Review<br />
process<br />
One tier<br />
One tier<br />
One tier<br />
One tier<br />
One tier<br />
Lead<br />
time<br />
<strong>for</strong><br />
submission<br />
30 days<br />
30 days<br />
30 days<br />
30 days<br />
30 days<br />
Notes<br />
1 For tracers in hydrology studies only consent <strong>for</strong> operation is required.<br />
2 Biomedical studies are to be carried only in an already approved laboratory <strong>for</strong> handling open<br />
isotopes. As such no separate clearance <strong>for</strong> siting and layout plan approval is required.<br />
2.8 Consent/Approval<br />
2.8.1 Type Approval <strong>for</strong> Source(s), Equipment, Devices and Packages<br />
A Consent in the <strong>for</strong>m of type approval shall be necessary <strong>for</strong>:<br />
(i)<br />
sealed sources, radiation generating equipment and equipment<br />
containing radioactive sources <strong>for</strong> the purposes of manufacture and<br />
supply;<br />