explained in section 3, <strong>for</strong> issuing Consent in the <strong>for</strong>m of a Registration <strong>for</strong><br />

radiation facility as defined in subsection 2.7.1(i-v) are illustrated in Table<br />

given in subsection 2.7.2.<br />

2.7.2 Consents, Review <strong>Process</strong> and Lead Time at Various Stages<br />

Consents, review process and lead time required at various stages of<br />

consenting process <strong>for</strong> radiation facilities defined in subsection 2.7.1(i-v).<br />

<strong>Radiation</strong><br />

facility as<br />

defined in sec.<br />

2.7.1(i-v)<br />

(i) Medical<br />

diagnostic<br />

X-ray equipment<br />

including<br />

therapy<br />

simulator;<br />

(ii) Nucleonic<br />

gauges<br />

(iii) Radioimmuno-assay<br />

(RIA)<br />

laboratories;<br />

(iv) Radioactive<br />

sources<br />

in tracer<br />

studies;<br />

(v) Biomedical<br />

research using<br />

radioactive<br />

material;<br />

Consent<br />

<strong>for</strong><br />

siting/<br />

(a)<br />

---<br />

Not<br />

required<br />

---<br />

---<br />

---<br />

Consent <strong>for</strong><br />

construction<br />

/layout<br />

plan<br />

approval<br />

(b)<br />

Combined<br />

Consent (a)<br />

and (b)<br />

Not required<br />

Required<br />

Combined<br />

consent (a)<br />

and (b)<br />

Required<br />

Combined<br />

consent (a)<br />

and (b)<br />

Required 2<br />

Combined<br />

consent (a)<br />

and (b)<br />

Consent<br />

<strong>for</strong><br />

commissioning<br />

(c)<br />

---<br />

---<br />

---<br />

---<br />

---<br />

Consent <strong>for</strong><br />

operation<br />

(registration)<br />

(d)<br />

Combined<br />

Consent (c)<br />

and (d)<br />

Combined<br />

Consent (c)<br />

and (d)<br />

Combined<br />

Consent<br />

(c) and (d)<br />

Combined 1<br />

Consent<br />

(c) and (d)<br />

Combined<br />

Consent (c)<br />

and (d)<br />

Consent<br />

<strong>for</strong><br />

decommissioning/<br />

disposal<br />

(e)<br />

Not<br />

required<br />

Required<br />

Not<br />

required<br />

Not<br />

required<br />

Not<br />

required<br />

Review<br />

process<br />

One tier<br />

One tier<br />

One tier<br />

One tier<br />

One tier<br />

Lead<br />

time<br />

<strong>for</strong><br />

submission<br />

30 days<br />

30 days<br />

30 days<br />

30 days<br />

30 days<br />

Notes<br />

1 For tracers in hydrology studies only consent <strong>for</strong> operation is required.<br />

2 Biomedical studies are to be carried only in an already approved laboratory <strong>for</strong> handling open<br />

isotopes. As such no separate clearance <strong>for</strong> siting and layout plan approval is required.<br />

2.8 Consent/Approval<br />

2.8.1 Type Approval <strong>for</strong> Source(s), Equipment, Devices and Packages<br />

A Consent in the <strong>for</strong>m of type approval shall be necessary <strong>for</strong>:<br />

(i)<br />

sealed sources, radiation generating equipment and equipment<br />

containing radioactive sources <strong>for</strong> the purposes of manufacture and<br />

supply;<br />

12