GUIDE NO. AERB/RF/SG/G-3 (Vol. 1 of
- Page 3 and 4:
Price Order for this guide should b
- Page 5 and 6:
such as industrial safety and envir
- Page 7 and 8:
Betatron An electron accelerator in
- Page 9 and 10:
Handle Manufacture, possess, store,
- Page 11 and 12:
Radioactive Waste Material, whateve
- Page 13 and 14:
Tomography Radiography of one or mo
- Page 15 and 16:
CONTENTS FOREWORD .................
- Page 17 and 18:
3.3.8 Lead Time for Submission/Avai
- Page 19 and 20:
3.8.3 Construction ................
- Page 21 and 22:
3.15.2 Procurement and Registration
- Page 23 and 24:
FUNCTIONAL PERFORMANCE OF SAFETY SY
- Page 25 and 26:
APPENDIX-5E (Refer section 3.4.1.4)
- Page 27 and 28:
GAMMA RADIATION PROCESSING FACILITY
- Page 29 and 30:
FACILITY FOR RADIATION TECHNOLOGY (
- Page 31 and 32:
ANNEXURE-33b APPLICATION FOR PROCUR
- Page 33 and 34:
BIOMEDICAL RESEARCH STUDIES ON HUMA
- Page 35 and 36:
ANNEXURE-59 APPLICATION FOR NO (3.1
- Page 37 and 38:
VOLUME - 1
- Page 39 and 40:
1.3 Scope This guide explains in de
- Page 41 and 42:
The Consenting process involves a c
- Page 43 and 44:
Applicant submits to AERB an applic
- Page 45 and 46:
(vii) (viii) (ix) interventional ra
- Page 47 and 48:
2.6 Authorisation 2.6.1 Authorisati
- Page 49 and 50:
explained in section 3, for issuing
- Page 51 and 52:
2 Equipment includes industrial pro
- Page 53 and 54:
presence of any ammunition dumps, a
- Page 55 and 56:
within the acceptable limits, the r
- Page 57 and 58:
The general requirements for accele
- Page 59 and 60:
period. Qualified and trained manpo
- Page 61 and 62:
3.3.3 Layout and Constration Approv
- Page 63 and 64:
In case accelerator beamlines are u
- Page 65 and 66:
and supporting heavy structures. Fu
- Page 67 and 68:
3.4.2 Facilities Engaged in the Com
- Page 69 and 70:
demineralised water pool is used fo
- Page 71 and 72:
The Consentee is required to submit
- Page 73 and 74:
3.5.1.4 Procurement of Source/ Equi
- Page 75 and 76:
3.5.1.6 Decommissioning/Disposal Co
- Page 77 and 78:
3.5.2.5 Commissioning and Operation
- Page 79 and 80:
3.6.2 Site and Layout Plan Approval
- Page 81 and 82: the device with source (IGRED) or X
- Page 83 and 84: The applicant should submit the App
- Page 85 and 86: The accelerator shall be housed in
- Page 87 and 88: dose rates. Pre-loaded and manual a
- Page 89 and 90: (i) (ii) (iii) (iv) (v) Qualified a
- Page 91 and 92: 3.9.3 Commissioning and Operation A
- Page 93 and 94: AERB may inspect the facility befor
- Page 95 and 96: (iv) (v) radiation protection acces
- Page 97 and 98: The manufacturer shall not manufact
- Page 99 and 100: Well logging is an evaluation techn
- Page 101 and 102: 3.13.1.2 Site and Layout Plan Appro
- Page 103 and 104: 3.13.1.6 Lead Time for Submission/A
- Page 105 and 106: The AERB assesses the application f
- Page 107 and 108: completion of decommissioning, cove
- Page 109 and 110: and also in teaching. Normally, a f
- Page 111 and 112: 3.17.2 Layout Plan Approval The lay
- Page 113 and 114: The applicant (local supplier) shou
- Page 115 and 116: 4. REVIEW AND ASSESSMENT PROCESS 4.
- Page 117 and 118: A final review of the design of the
- Page 119 and 120: adiation processing facility and hi
- Page 121 and 122: 4.10.2 Assessment Process For consi
- Page 123 and 124: 4.11.2.2 Assessment Process For con
- Page 125 and 126: Containing Radioactive Substances
- Page 127 and 128: LIST OF PARTICIPANTS DRAFT DOCUMENT
- Page 129 and 130: ADVISORY COMMITTEE ON PREPARATION O
- Page 131: PROVISIONAL LIST OF CODES, GUIDES A