demineralised water pool is used <strong>for</strong> source storage. The geological and soil<br />

characteristics are important from the point of view of supporting heavy<br />

structures. Further, presence of any ammunition dumps, storage of<br />

inflammable in the vicinity, distance of civil or military runway, if any, are<br />

also considered. The application <strong>for</strong>mat <strong>for</strong> obtaining consent <strong>for</strong> site is given<br />

in Annexure 17.<br />

3.4.3.3 Layout and Construction Approval<br />

The design of the IFRT shall meet the applicable requirements of AERB<br />

safety standards such as those prescribed <strong>for</strong> Land-based Stationary Gamma<br />

Irradiators.<br />

The general design requirements of IFRT should cover:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(vii)<br />

(viii)<br />

(ix)<br />

(x)<br />

(xi)<br />

(xii)<br />

(xiii)<br />

Layout of the facility<br />

Source handling equipment<br />

Biological shielding<br />

Water-pool and pool lining, permeability and seepage of water,<br />

evaporation rate and safe water level, system <strong>for</strong> purification and<br />

demineralisation of water, pH control and conductivity<br />

Provision <strong>for</strong> on-line pool water contamination, conductivity and<br />

pH monitoring<br />

Air handling unit, ventilation system<br />

Safety systems and safety interlocks<br />

Emergency systems<br />

Master slave manipulators (MSM)<br />

External transfer drawer (ETD)<br />

Electric overhead transport (EOT) crane<br />

Access control; and<br />

Management of radioactive waste disposal, if any.<br />

A preliminary safety analysis report (PSAR), the <strong>for</strong>mat of which is given in<br />

Appendix 6B, covering the above aspects along with application <strong>for</strong> obtaining<br />

consent <strong>for</strong> layout/construction approval as given in Annexure -18 should<br />

be submitted to AERB <strong>for</strong> review. The PSAR is reviewed bearing in mind (a)<br />

‘defence in depth’ principle by redundancy, diversity and independence in<br />

the design, (b) the importance of fail-safe-system in the event of any deviation<br />

from normal practice, (c) power failure, (d) access control and (e) design<br />

basis report <strong>for</strong> civil structural design.<br />

32