demineralised water pool is used <strong>for</strong> source storage. The geological and soil<br />
characteristics are important from the point of view of supporting heavy<br />
structures. Further, presence of any ammunition dumps, storage of<br />
inflammable in the vicinity, distance of civil or military runway, if any, are<br />
also considered. The application <strong>for</strong>mat <strong>for</strong> obtaining consent <strong>for</strong> site is given<br />
in Annexure 17.<br />
3.4.3.3 Layout and Construction Approval<br />
The design of the IFRT shall meet the applicable requirements of AERB<br />
safety standards such as those prescribed <strong>for</strong> Land-based Stationary Gamma<br />
Irradiators.<br />
The general design requirements of IFRT should cover:<br />
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
(vii)<br />
(viii)<br />
(ix)<br />
(x)<br />
(xi)<br />
(xii)<br />
(xiii)<br />
Layout of the facility<br />
Source handling equipment<br />
Biological shielding<br />
Water-pool and pool lining, permeability and seepage of water,<br />
evaporation rate and safe water level, system <strong>for</strong> purification and<br />
demineralisation of water, pH control and conductivity<br />
Provision <strong>for</strong> on-line pool water contamination, conductivity and<br />
pH monitoring<br />
Air handling unit, ventilation system<br />
Safety systems and safety interlocks<br />
Emergency systems<br />
Master slave manipulators (MSM)<br />
External transfer drawer (ETD)<br />
Electric overhead transport (EOT) crane<br />
Access control; and<br />
Management of radioactive waste disposal, if any.<br />
A preliminary safety analysis report (PSAR), the <strong>for</strong>mat of which is given in<br />
Appendix 6B, covering the above aspects along with application <strong>for</strong> obtaining<br />
consent <strong>for</strong> layout/construction approval as given in Annexure -18 should<br />
be submitted to AERB <strong>for</strong> review. The PSAR is reviewed bearing in mind (a)<br />
‘defence in depth’ principle by redundancy, diversity and independence in<br />
the design, (b) the importance of fail-safe-system in the event of any deviation<br />
from normal practice, (c) power failure, (d) access control and (e) design<br />
basis report <strong>for</strong> civil structural design.<br />