2.6 Authorisation<br />
2.6.1 Authorisation <strong>for</strong> Operation<br />
The Consent <strong>for</strong> operation on a regular basis is in the <strong>for</strong>m of an Authorisation<br />
<strong>for</strong>:<br />
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
Brachytherapy facilities<br />
Gamma irradiation chambers<br />
Nuclear medicine facilities<br />
<strong>Facilities</strong> engaged in the commercial production of nucleonic gauges<br />
and consumer products containing radioactive material<br />
Radioactive sources in well logging<br />
Such other source or practice as may be notified by the competent<br />
authority from time to time.<br />
‘Stages of <strong>Consenting</strong> <strong>Process</strong>’ as defined in subsection 2.3 and ‘Regulatory<br />
<strong>Consenting</strong> Procedures’ as defined in 2.4, wherever applicable, and explained<br />
in section 3, <strong>for</strong> issuing consent in the <strong>for</strong>m of an Authorisation <strong>for</strong> radiation<br />
facility as defined in subsection 2.6.1(i-v) are illustrated in Table given in<br />
subsection 2.6.2.<br />
2.6.2 Consents, Review <strong>Process</strong> and Lead Time at Various Stages<br />
Consents, review process and lead time required at various stages of<br />
consenting process <strong>for</strong> radiation facilities as defined in subsection<br />
2.6.1(i-v) are as follows:<br />
<strong>Radiation</strong><br />
facility as<br />
defined in<br />
2.6.1(i-v)<br />
(i) Brachytherapy<br />
facilities<br />
(ii) Gamma<br />
irradiation<br />
chambers;<br />
(iii) Nuclear<br />
medicine<br />
facilities;<br />
Consent<br />
<strong>for</strong><br />
siting<br />
(a)<br />
---<br />
---<br />
---<br />
Consent <strong>for</strong><br />
construction/<br />
layout plan<br />
approval<br />
(b)<br />
Combined<br />
Consent (a)<br />
and (b)<br />
Combined<br />
Consent (a)<br />
and (b)<br />
Combined<br />
Consent (a)<br />
and (b)<br />
Consent<br />
<strong>for</strong><br />
commissioning<br />
(c )<br />
---<br />
---<br />
---<br />
Consent <strong>for</strong><br />
operation<br />
(Authorisation)<br />
(d)<br />
Combined<br />
Consent (c )<br />
and (d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Consent<br />
<strong>for</strong><br />
decommissioning/<br />
disposal<br />
(e)<br />
Required<br />
Required<br />
Required<br />
Review<br />
process<br />
One tier<br />
One tier<br />
One tier<br />
Lead<br />
time<br />
<strong>for</strong><br />
submission<br />
30 days<br />
30 days<br />
30 days<br />