Consenting Process for Radiation Facilities - Atomic Energy ...
Consenting Process for Radiation Facilities - Atomic Energy ...
Consenting Process for Radiation Facilities - Atomic Energy ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(vii)<br />
(viii)<br />
(ix)<br />
interventional radiological X-ray unit;<br />
industrial radiography; and<br />
such other source or practice as may be notified by the competent<br />
authority from time to time.<br />
‘Stages of <strong>Consenting</strong> <strong>Process</strong>’ as defined in subsection 2.3 and ‘Regulatory<br />
<strong>Consenting</strong> Procedures’ as defined in 2.4, wherever applicable, and explained<br />
in section 3, <strong>for</strong> issuing consent in the <strong>for</strong>m of an Authorisation <strong>for</strong> radiation<br />
facility as defined in subsection 2.5.1(i-viii) are illustrated in Table given in<br />
subsection 2.5.2.<br />
2.5.2 Consents, Review <strong>Process</strong> and Lead Time at Various Stages<br />
Consents, review process and lead time required at various stages of<br />
consenting process <strong>for</strong> radiation facilities as defined in subsection<br />
2.5.1(i-viii) are as follows:<br />
<strong>Radiation</strong><br />
facility as<br />
defined in<br />
2.5.1(i-viii)<br />
(i) Land based<br />
high intensity<br />
gamma<br />
radiation<br />
processing<br />
facility other<br />
than gamma<br />
irradiation<br />
chambers;<br />
(ii) High<br />
energy particle<br />
accelerators<br />
used <strong>for</strong><br />
research and<br />
industrial<br />
processing<br />
applications;<br />
(iii) Neutron<br />
generators;<br />
(iv) <strong>Facilities</strong><br />
engaged in the<br />
commercial<br />
production of<br />
radioactive<br />
material or radiation<br />
generating<br />
quipment 7 ;<br />
Consent<br />
<strong>for</strong><br />
siting<br />
(a)<br />
Required<br />
Required<br />
Required<br />
Required<br />
Consent <strong>for</strong><br />
layout pan/<br />
construction<br />
approval<br />
(b)<br />
Required<br />
Required 1<br />
Required<br />
Required/not<br />
required 3<br />
Consent<br />
<strong>for</strong><br />
commissioning<br />
(c )<br />
---<br />
Required<br />
Required<br />
---<br />
Consent <strong>for</strong><br />
operation<br />
(Licence)<br />
(d)<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Required 2<br />
Required<br />
Combined<br />
Consent (c)<br />
and (d)<br />
Consent Review 9<br />
<strong>for</strong> process<br />
decommissioning/<br />
disposal<br />
(e)<br />
Required Three tier<br />
Required Three tier<br />
Required Three tier<br />
Required/ Three/<br />
not two tier 5<br />
required 4<br />
Lead<br />
time 11<br />
90 days<br />
90 days<br />
90 days<br />
90/60 6<br />
days<br />
8