- Page 1 and 2: GUIDE NO. AERB/RF/SG/G-3 (Vol. 1 of
- Page 3: Price Order for this guide should b
- Page 7 and 8: Betatron An electron accelerator in
- Page 9 and 10: Handle Manufacture, possess, store,
- Page 11 and 12: Radioactive Waste Material, whateve
- Page 13 and 14: Tomography Radiography of one or mo
- Page 15 and 16: CONTENTS FOREWORD .................
- Page 17 and 18: 3.3.8 Lead Time for Submission/Avai
- Page 19 and 20: 3.8.3 Construction ................
- Page 21 and 22: 3.15.2 Procurement and Registration
- Page 23 and 24: FUNCTIONAL PERFORMANCE OF SAFETY SY
- Page 25 and 26: APPENDIX-5E (Refer section 3.4.1.4)
- Page 27 and 28: GAMMA RADIATION PROCESSING FACILITY
- Page 29 and 30: FACILITY FOR RADIATION TECHNOLOGY (
- Page 31 and 32: ANNEXURE-33b APPLICATION FOR PROCUR
- Page 33 and 34: BIOMEDICAL RESEARCH STUDIES ON HUMA
- Page 35 and 36: ANNEXURE-59 APPLICATION FOR NO (3.1
- Page 37 and 38: VOLUME - 1
- Page 39 and 40: 1.3 Scope This guide explains in de
- Page 41 and 42: The Consenting process involves a c
- Page 43 and 44: Applicant submits to AERB an applic
- Page 45 and 46: (vii) (viii) (ix) interventional ra
- Page 47 and 48: 2.6 Authorisation 2.6.1 Authorisati
- Page 49 and 50: explained in section 3, for issuing
- Page 51 and 52: 2 Equipment includes industrial pro
- Page 53 and 54: presence of any ammunition dumps, a
- Page 55 and 56:
within the acceptable limits, the r
- Page 57 and 58:
The general requirements for accele
- Page 59 and 60:
period. Qualified and trained manpo
- Page 61 and 62:
3.3.3 Layout and Constration Approv
- Page 63 and 64:
In case accelerator beamlines are u
- Page 65 and 66:
and supporting heavy structures. Fu
- Page 67 and 68:
3.4.2 Facilities Engaged in the Com
- Page 69 and 70:
demineralised water pool is used fo
- Page 71 and 72:
The Consentee is required to submit
- Page 73 and 74:
3.5.1.4 Procurement of Source/ Equi
- Page 75 and 76:
3.5.1.6 Decommissioning/Disposal Co
- Page 77 and 78:
3.5.2.5 Commissioning and Operation
- Page 79 and 80:
3.6.2 Site and Layout Plan Approval
- Page 81 and 82:
the device with source (IGRED) or X
- Page 83 and 84:
The applicant should submit the App
- Page 85 and 86:
The accelerator shall be housed in
- Page 87 and 88:
dose rates. Pre-loaded and manual a
- Page 89 and 90:
(i) (ii) (iii) (iv) (v) Qualified a
- Page 91 and 92:
3.9.3 Commissioning and Operation A
- Page 93 and 94:
AERB may inspect the facility befor
- Page 95 and 96:
(iv) (v) radiation protection acces
- Page 97 and 98:
The manufacturer shall not manufact
- Page 99 and 100:
Well logging is an evaluation techn
- Page 101 and 102:
3.13.1.2 Site and Layout Plan Appro
- Page 103 and 104:
3.13.1.6 Lead Time for Submission/A
- Page 105 and 106:
The AERB assesses the application f
- Page 107 and 108:
completion of decommissioning, cove
- Page 109 and 110:
and also in teaching. Normally, a f
- Page 111 and 112:
3.17.2 Layout Plan Approval The lay
- Page 113 and 114:
The applicant (local supplier) shou
- Page 115 and 116:
4. REVIEW AND ASSESSMENT PROCESS 4.
- Page 117 and 118:
A final review of the design of the
- Page 119 and 120:
adiation processing facility and hi
- Page 121 and 122:
4.10.2 Assessment Process For consi
- Page 123 and 124:
4.11.2.2 Assessment Process For con
- Page 125 and 126:
Containing Radioactive Substances
- Page 127 and 128:
LIST OF PARTICIPANTS DRAFT DOCUMENT
- Page 129 and 130:
ADVISORY COMMITTEE ON PREPARATION O
- Page 131 and 132:
PROVISIONAL LIST OF CODES, GUIDES A