<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 102 / 257<br />

Years from Decommissioning<br />

No. Task -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 DISMANTLING OF 1 <strong>EPR</strong> UNIT<br />

2 Cessation of unit operation<br />

3 Permanent shutdown of the unit<br />

4 Dismantling of the unit<br />

5 Nuclear Auxiliary Building<br />

6 Fuel Building<br />

7 Reactor Building<br />

8 Auxiliary circuit dismantling prior to primary circuit<br />

9 Dismantling of primary circuit<br />

10 Dismantling of the 4 loops with SG evacuation<br />

11 Dismantling of the SG in a dedicated workshop<br />

12 Dismantling of RPV, intervals and reactor pit<br />

13 End of dismantling of auxiliary equipment<br />

14 RB decontamination and cleaning<br />

15 Other buildings (safeguard building, waste building…)<br />

16 Demolition of buildings<br />

SG – Steam Generator<br />

RPV – Reactor Pressure Vessel<br />

RB – Reactor Building<br />

FIGURE 26: INDICATIVE DISMANTLING PROGRAMME FOR ONE <strong>EPR</strong> UNIT