16.01.2015 Views

Solid Radioactive Waste Strategy Report.pdf - UK EPR

Solid Radioactive Waste Strategy Report.pdf - UK EPR

Solid Radioactive Waste Strategy Report.pdf - UK EPR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 236 / 257<br />

FIGURE 98: DRY UNLOADING CELL INTERNAL VIEW<br />

d) Fuel assembly identification<br />

Before being placed into a storage canister, the spent fuel assemblies are transferred to a<br />

checking station located in front of the unloading cell. The fuel assembly identification is<br />

confirmed and a visual check of the fuel assembly integrity is completed.<br />

e) Fuel assembly canisterization<br />

The fuel assemblies are removed from the transport container and placed in a storage<br />

canister, with six fuel assemblies being placed into each storage canister.<br />

A transfer trolley performs the following tasks:<br />

· carries the empty fuel assembly canister to the canister docking system;<br />

· lifts the fuel assembly canister under the docking station;<br />

· rotates the fuel assembly canister during the welding and contamination; control<br />

operations; and<br />

· transfers full canisters to the handling hall.<br />

The fuel assemblies canister docking system ensures an airtight connection between the fuel<br />

assemblies canister internal cavity and the fuel assembly unloading cell. The fuel assemblies<br />

canister lid is then welded shut, with the welding parameters and the rotation speed being<br />

monitored continuously during welding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!